BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name Ironwood Drive Pavement Rehabilitation and Intersection
<br />Project No, 117-071A
<br />For Bids Due February 27, 2018
<br />BASE BID
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Construction Engineering
<br />1
<br />LSUM
<br />$6,600.00
<br />$6,600.00
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LSUM
<br />$60,000.00
<br />$60,000.00
<br />3
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />$9,000.00
<br />$9,000.00
<br />4
<br />Pavement Removal
<br />4,215
<br />SYS
<br />$8.00
<br />$33,720.00
<br />5
<br />Curb and Gutter, Remove
<br />985
<br />LFT
<br />$3,00
<br />$2,955.00
<br />6
<br />Sidewalk, Concrete, Remove
<br />457
<br />SYS
<br />$6.00
<br />$2,742.00
<br />7
<br />Pipe, Remove Existing Storm Sewer
<br />856
<br />LFT
<br />$22.00
<br />$18,832.00
<br />8
<br />Structure, Remove Existing Storm
<br />Manhole
<br />11
<br />EACH
<br />$626.00
<br />$6,886.00
<br />9
<br />Pipe, Abandon Existing Storm Sewer
<br />100
<br />LFT
<br />$44.00
<br />$4,400.00
<br />10
<br />Excavation, Common
<br />1,116
<br />CYS
<br />$17,79
<br />$19,853.64
<br />11
<br />Borrow
<br />25
<br />CYS
<br />$116.00
<br />$2,900.00
<br />12
<br />Temporary Erosion and Sediment Control
<br />1
<br />LS
<br />$1,000.00
<br />$1,000.00
<br />13
<br />Temporary Drop Inlet Protection
<br />29
<br />EACH
<br />$48.00
<br />$1,392,00
<br />14
<br />Temporary Silt Fence
<br />732
<br />LFT
<br />$2.25
<br />$1,647,00
<br />15
<br />Subgrade Treatment, Type 1
<br />4,495
<br />SYS
<br />$3,00
<br />$13,485.00
<br />16
<br />Subgrade Treatment, Type II
<br />125
<br />SYS
<br />$34.00
<br />$4,250.00
<br />17
<br />Subbase for PCCP
<br />1,116
<br />CYS
<br />$93.00
<br />$103,788.00
<br />18
<br />HMA Patching, Type C
<br />63
<br />TON
<br />$78,00
<br />$51,714.00
<br />19
<br />Milling, Asphalt, Transition
<br />355
<br />SYS
<br />$7.00
<br />$2,485.00
<br />20
<br />Milling, Asphalt, 1.5 in.1,060
<br />SYS
<br />$2.25
<br />$24,885.00
<br />21
<br />HMA Surface
<br />98;
<br />TON
<br />$89.00
<br />$88,021.00
<br />22
<br />HMA Wedge and Level
<br />100
<br />TON
<br />$89.00
<br />$8,900.00
<br />23
<br />Joint Adhesive, Surface
<br />6,320
<br />LFT
<br />$1.00
<br />$6,320.00
<br />24
<br />Asphalt for Tack Coat
<br />3,5
<br />TON
<br />$1.00
<br />$3.50
<br />25
<br />PCCP, 10-in.
<br />4,254
<br />SYS
<br />$57.00
<br />$242,478.00
<br />26
<br />D-1 Contraction Joint
<br />2,050
<br />LFT
<br />$8.34
<br />$17,097.00
<br />Bidder (Firm): ', -t- vk,- � ; \ -e-
<br />Version 10/17/2017 Contractor's Bid for Public Works - 7
<br />Revised February 22, 2018 (Addendum 1)