EASE BID
<br />Item
<br />No,
<br />Description
<br />Quantity
<br />--30
<br />Unit
<br />Unit Prig
<br />�^
<br />Total Amountury
<br />--
<br />27
<br />Retrofitted Tie Mars
<br />----.._496
<br />EACH
<br />--
<br />$25_.00
<br />T�$35.60^-�
<br />--
<br />$750.00
<br />-- --
<br />28
<br />Sidewalk, Concrete, 4-in.
<br />SYS
<br />$17,657.60
<br />29
<br />Sidewalk, Concrete, 6-in.
<br />17
<br />--115
<br />SYS
<br />_
<br />$61.80 _.
<br />$1050.60
<br />__.-_$12,880.00 -
<br />30
<br />Curb lamp, Concrete, 6-in,
<br />---13 - �
<br />SYS
<br />-
<br />� $112.00
<br />^ --
<br />Tm$2080.00
<br />31
<br />Delectable Warning Surface
<br />-------
<br />-4V839 -
<br />SYS--
<br />$160.00
<br />-
<br />32
<br />Curb, Integral, Concrete
<br />LFT
<br />$30.50
<br />$25,589.50YY
<br />33
<br />PCCP for Approaches, 9-in.
<br />58
<br />SYS --
<br />$67.20
<br />$3897.60
<br />34
<br />HMA for Approaches, Type C _.. -
<br />18 --
<br />-
<br />--TON -
<br />- --
<br />--$146.00--
<br />-
<br />$2628.00 T-
<br />35
<br />Nursery Sodding
<br />76
<br />SYS
<br />$9.80
<br />$744.80
<br />36
<br />tJndcrdrains � -m---
<br />1,005
<br />_
<br />� LFT
<br />-
<br />$22.00
<br />---
<br />$22,110.00
<br />37
<br />Pipe, 6-in.
<br />8 ---
<br />LFT -
<br />-- $22.00
<br />$176,00 --
<br />38
<br />Pipe, 12-in.
<br />444
<br />LFT _
<br />�$28.00
<br />$12,432.00
<br />39
<br />Pipe, 15 •€n.
<br />314 _.
<br />�.-LFT
<br />$26.00_..__
<br />$8164.00
<br />40
<br />Pipe, 18-in.
<br />154 YWWW
<br />LFT
<br />$28.00--
<br />$4312.00
<br />41
<br />Connect to Existing Pipe or Structure
<br />W4- 7�
<br />EACH -
<br />$1500.00 �
<br />V $10,500.00 ---
<br />42
<br />Manhole, C-4
<br />6
<br />-1 --
<br />EACH W
<br />-YEACH
<br />- $3800.00�
<br />$22,800.00 -_
<br />43
<br />Manhole, L-4
<br />$3800.00
<br />vv $3800.00-�
<br />44
<br />Inlet, B-15
<br />10
<br />EACH
<br />$3500.00YW
<br />$35,000.00�
<br />45
<br />Inlet, C-15
<br />2 -.--
<br />-�
<br />EACH
<br />---
<br />$3500,00
<br />---YY
<br />---
<br />$7000.00 �.
<br />46
<br />Casting, Adjust to Grade
<br />ngA_.---___--
<br />5
<br />FACI-I-W
<br />$750.00
<br />$3750.00 _
<br />47
<br />Maintenance of Traffic
<br />-
<br />1
<br />-
<br />LSUM
<br />$5075.00
<br />$5075.00
<br />48
<br />Construction Sign, A
<br />23
<br />EACH
<br />49
<br />Construction Sign, S
<br />5
<br />^^^- ---
<br />EACH
<br />$50.00
<br />$250,00
<br />50
<br />Construction Sign, C
<br />$
<br />_
<br />EACH
<br />$125.00_
<br />$500.00_
<br />-Y$250.00
<br />5-1
<br />Road Closure Sian Assembly
<br />2
<br />EACH
<br />$125.00
<br />Temporary Pavement Marking,
<br />52
<br />Removable, 4-in.
<br />12,465
<br />LFT
<br />$0.89
<br />$11,093.85
<br />53
<br />_
<br />Temporary Pavement Marking, Painl,---
<br />-
<br />_
<br />4-in.
<br />2,745
<br />LFT
<br />$0.38
<br />$1043.10
<br />54
<br />Temporary Pavement Marring,
<br />-
<br />Removably:, Lane Indication Arrow
<br />2
<br />t
<br />EACH
<br />$70M
<br />$140.00
<br />55
<br />Temporary Pavement Marking,
<br />Removabte, 24-in.
<br />60
<br />LFT
<br />$5.10
<br />$306.00
<br />�6
<br />Detour Route Marker Assembly
<br />21
<br />EACH
<br />$89.00
<br />$1869.00
<br />Bidder (Finn):
<br />C & E Excavating, Inc.
<br />Version 10117/20'17 Contractor's (aid for PUblir Works - 8
<br />Revised February 22, 2018 (Adder3dum 4 )
<br />
|