Laserfiche WebLink
ADDENDUM No, 1 <br />Ironwood Drive Pavement Rehabilitation and Intersection <br />Project No, 117-071A <br />OWNER: City of South Bend <br />ENGINEER: Lawson -Fisher Associates P.C. <br />Benjamin P. Holden, P.E. <br />Professional Engineer No. PE10100265 <br />SUBJECT: Additions to Contract <br />DATE: February 22, 2018 <br />This Addendum to the Contract Documents shall supplement, amend, and shall become a part <br />of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change <br />Order: <br />1. Plan sheets 2, 12, 31, 32, 34 have been revised to extend pavement rehabilitation <br />at the south end of the project. <br />2. Plan sheets 11A and 11B have been added to extend pavement rehabilitation at <br />the south end of the project. <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />REPLACE Pages 7-11, with the attached revised pages 7-11. <br />SPECIFICATIONS: <br />XXIII. Plans <br />REVISE B.1. The Plans consist of 46 Sheets, <br />XXXIV. Su_bgrade Treatment <br />ADD B.2. No. 53 Recycled Concrete may be used for subgrade treatment. <br />XXXVI. HMA Patchinq <br />ADD 6.10. HMA Base used for full depth HMA Patching shall be 25.0 mm, <br />XXXVIII. Hot Mix Asphalt <br />REVISE 13.3. The PG Binder used in surface mixture shall be PG 70-22. The PG Binder <br />used in intermediate and base mixtures shall be PG 64-22. <br />REVISE BA. The maximum binder replacement for all s FfaE3e FRi)dUFes shall be 15 <br />and for a' intermediate and base courses shall be 25%. <br />Sheet 1 of 2 <br />