My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Hibberd Plaza and Streetscape Proj No 117-063R - R. Yoder Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Hibberd Plaza and Streetscape Proj No 117-063R - R. Yoder Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2025 3:06:36 PM
Creation date
3/14/2018 9:25:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4-3.11 (e) COOL DOWN <br />Cool down may be accomplished by the introduction of cool water or air into the installation <br />standpipe to replace water or pressurized air being relieved from the manhole. Cool the <br />hardened pipe to a temperature below 100' F before relieving the static head. A minimum <br />period of post -cure shall be maintained under a static head to provide a minimum hoop tension <br />on the tube felt. Care shall be taken in the release of the static head so that a vacuum will not <br />be developed. <br />4-3.11(0 END SEALS <br />Install hydrophilic end seals to provide a water -tight connection at all pipe and manhole <br />connections. End Seals shall be installed per manufacturer's recommendations. <br />4-3.11 W FINISH <br />1.) The finished lining shall be continuous over the entire length of an insertion run between <br />two manholes and be as free as commercially practical from visual defects such as foreign <br />inclusions, dry spots, pinholes, and delamination. The lining shall be homogeneous, <br />impervious, and free of any leakage from the surrounding ground to the inside of the lined <br />pipe. <br />2.) During the warranty .period, any defects which will affect the integrity or strength of the <br />liner, collect solids, or reduce hydraulic flow capabilities of the product shall be repaired. <br />4-3.11 0) REINSTATE LATERALS AND SERVICES <br />1.) Accurate location of the lateral and service connections shall be made by inspection of the <br />pre -installation video recording. <br />2.) Upon completion of the main Iine CIPP installation and the approved <br />infiltration/exfiltration testing, immediately proceed with the reinstatement of the lateral <br />sewers. Reinstatement of lateral sewers shall be completed within 12 hours of service <br />disruption. <br />3.) After the liner has been installed, all existing active lateral sewers and services shall be <br />reinstated unless otherwise indicated by the City Engineer. The reinstatement of laterals <br />and services shall be done without excavation. Reinstatement of laterals and services will <br />be accomplished from the interior of the pipeline by means of a television camera directed <br />cutting device or by direct personnel entry when feasible. All cut lateral and service <br />connections shall be brushed to ensure they are free of burrs, frayed edges, or any <br />restriction preventing free flow of wastewater. Laterals shall be reinstated to a minimum <br />of 90% of their original diameter and no more than 100% of their minimum diameter. The <br />CIPP liner shall be tightly sealed at the cut openings with no gaps. All coupons cut from <br />the liner as a result of reopening the lateral connections shall be retrieved from the sewer <br />and accounted for. <br />
The URL can be used to link to this page
Your browser does not support the video tag.