Laserfiche WebLink
203 <br />'.-ednesday, September 29th., I926. <br />0 <br />the pavement on Yeade 6treefrom N. Y. C. R. R. to 'ample Street under Improvement <br />Resolution No.I633 <br />In the above matter several property o,,-aners appeared and remonstrated against <br />the water connections assessments but upon investigation City Engineer, P,Tr. ?Fray, <br />finds that the water connection against lot #659 is correct as there is a double <br />house built on this lot, one side f acing TrT_eade Street and the other facing Ford Street <br />Ili the complaint of property owners against water connections on 16ts No.965 and <br />No.966, City Engineer, Yr. ',Tray, finds that these water connections had been made <br />previous to the time of the pavement improvement and therefore should not be assessed <br />against these properties. The Board modifies the assessments on these two lots <br />!I in the amounts of the water connections, leaving the total assessments 234.73 for <br />each of these lots. In the matter of the 8 foot strip which was assessed against <br />lot 610, the Board finds that an error was made by the abstractor in showing this <br />strip as belonging to 6I0 instead of to lot 6II, and the hoard, therefore, changes <br />roll to show the 8 foot strip belonging to lot 6II and the property of Yike and <br />Cyrilla Beke. <br />After hearing all persons interested insaid roll, the Board finds that <br />the lots and tracts of land assessed on said roll have been benefited in the amounts <br />named on said roll, and therefore declares said roll, filed September 22nd. , 1926, <br />in all things ratified, confirmed and approved, with the above modifications. <br />Yeeting adjourned at I0:30. <br />1�414erk o the Board <br />Tuesday, October 5th., I926. <br />Board met in regular session at 9 A. T, . All members Present. <br />"inutes of meetings held September 28th., and September 29th., I926, read <br />and a ppr owed. <br />Board signed the contract and approved the construction bond of the <br />Albert Construction Co... for the pavement of Palmer Blvd., under Improvement Resolutio <br />No.I723.. Construction bond being for IW of the amount of the contract, 18,864.00 <br />and signed by the Inland Bonding Co. <br />• The Board approved the Guarantee Bond of the 111bert Construction Co., fore <br />the ='eade Street pavement under Improvement Resolution Nol�33, signed by the Inland <br />Bonding Co . , for I01'1 of the contract r. ric e', �5, 743 . 19. <br />The Board approved the drive way at 205 is-eade Street, presented by <br />`�-�hitmarsh for his Coal yard at the above a ddress. <br />City sgineer, �`r. TT r. ray, filed plans and specific^tions and the <br />Board adopted a resolution for the grading_ of the alley South- of Lu'bail from I-emble <br />Street to Dougla-s Street under Improver erit Resolution No.I750. <br />In the above matter, the Board orders that on the 27th. , day of October, <br />I926, this Board at it's office in the City l �,,ll at 7-I5 P. Y. , will hear and receive <br />remonstrances from all Persons interested in or affected by said proceedings. Board <br />further orders that notices of Ibis hearing_ be published on the 7tr. , C-ay of October <br />and on the I4th., day of October, I926, in the Yews Times and i'ribune, and that all <br />property owners be notifidd according to law. <br />City Engineer, Yr. H. G.1ray, filed the following assessment rolls: <br />Ppvement on �`oberts Street -rom==ishawaka avenue to Ruskin Street under <br />Improver-ent Resolution No.I608. <br />Pavement on JUley between 1,onroe street and South Street from 11'"ichigan to <br />alley East of Tichigan under Improvement Resolution TTo.I548. <br />In both of the above matters, the Board hereby orders, that on the I3th., <br />day of October, 1926, this Board at it's office in the City Hall at 7-I5 P. T,% , will <br />