.. .............. ..
<br />Wednesday Evening May 5th. 1926 ( continued
<br />%ids were received, opened and read on the cement walk on Eddy
<br />Street from Bronson Street to Bellmont Street. 'Waiver)
<br />Easton Ball, only bidder .
<br />Cement walk .70 per lineal foot.
<br />ii
<br />Bids having been received for the improvement of Phillippa Street under
<br />Improvement Resolution No.16I9, the Board now, this 5th., day of'Ynay, 1926,
<br />makes a preliminary order for .Asphaltic Concrete as the 'rind of pavement with
<br />which said street s'-all be improved and fixes the I8th., day of T,"ay, I926, at
<br />ji
<br />I0:00 A. Y.J. as the time when said Board will ei':her pass on petition for
<br />changing the bind of pavement , let said contract, or reject all bids. The
<br />""'illiston Construction Co., being the lowest bidder on. the above improvement,
<br />is hereby given a preliminary order for the improvement at their low bid"of
<br />',/_I8,333.8I.
<br />Bids having been received for the improvement of Grant Street under Improvement
<br />~resolution No.I6II, the Board now, this 5th., day of 11"ay, I926, makes a
<br />preliminary order for Asphaltic Concrete, as the kind of pavement with which
<br />said street shall be improved and fixes the I8th., day of !,ay,.I926, at I0:00
<br />A. Y. as the time when said Board shall either pass on petitions,for changing
<br />the kind of pavement, let said contract, or reject all bids. The Keith Riley
<br />Construction Co., being the lowest bidder on the above named improvement is
<br />hereby, given a preliminary order for the Improvement at their low bid of
<br />q4, 747.97
<br />Rids having been received for the Improvement of Brookfield Street under
<br />Improvement Resolution No. I620, the Board now, this 5th., day of T"ay, I926,
<br />makes a preliminary order for Asphaltic Concrete as the kind of pavement with
<br />which said street shall be improved and fixes the I8th., day of Lay, I926, at
<br />I0:00 A. Y. as the time when said Board will either pass on petitions for
<br />changing the kind of pavement, let
<br />said contract or reject all bids.
<br />The
<br />,,7illiston Construction Co., being
<br />the lowest
<br />bidder on the above named improvement
<br />is hereby, given P preliminary order
<br />for th-�
<br />Improvement at their low bid of
<br />-42, 593.50.
<br />Engineer filed tabulation of bids
<br />on Grant
<br />Street under Improvement
<br />F',esolution
<br />No.I6II.
<br />Sheet Asphalt. Asphaltic Concrete
<br />Concrete!
<br />'!illiston Construction Co
<br />I51824.23
<br />I5,044.85
<br />Reith Riley Construction Co
<br />I5,593.75
<br />I4,747.97
<br />Albert Construction Go
<br />I5,9I6.59
<br />I5,236.I4
<br />K. ". Reed °- Sons
<br />I4,040.55
<br />Engineer filed tabulation of bids for tTe rave-ent of Phil.lippa Street under
<br />Improvement Resolution Co.I6I9.
<br />S}`?eet Asphalt
<br />Albert Construction Co I9,640.57
<br />Reith Riley Construction 199802.37
<br />"illiston Construction Co I9,348.09
<br />H. " Feed Rr Sons
<br />Asphaltic Concrete Conrete
<br />I81944.8I
<br />I8,711.53
<br />I81333.8I
<br />I7 2.79.96
<br />•
<br />0
<br />
|