My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/05/1926 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1926
>
05/05/1926 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:36:03 AM
Creation date
3/8/2018 1:09:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/5/1926
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10a <br />Wednesday Evening, Yay 5th., 1926 <br />Board net in regular session at 7-I5 P. Y. All members present. <br />Bids for the South Fast Trunk Sewer under Improvement Resolution No.I635 were <br />received, opened and read as follows: <br />Bid of Carl D."Traxler. <br />Vitrified Sewer Pipe. 24 inch I5 inch I2 inch <br />5,00 2.75 2.50 <br />Cast Iron 5.00 6.00 <br />Independent Concrete.Pipe. 90 inch 84 inch 78 inch 66 inch <br />32.20 28.65 26.I5 23.00 <br />Re -enforced Concrete Pipe 4e inch 30 inch <br />Ie.00 I6.50 <br />T-,Tanh.oles I0.00 each Yanhole curbs and covers I7.50.each <br />Outlet Chamber, 6,750.00. Jet Chamber I.250.00. receiving Chamber 750.00. <br />Bid of George Ponta relli. <br />48 inch 90 inch 84 inch 78 inch 66 inch anholes <br />20.00 38975 36.75 30.00 25.00 8.00 <br />Retaining "',all complete, `�I09,000.00. <br />Bid of I. " . Staples. <br />Yanhole curbs covers <br />I5.00 <br />Vitrified Sewer Pipe. I5 inch I2 <br />inch <br />30 inch <br />24 inch <br />4.00 <br />2.00 <br />I0.00 <br />6.00 <br />Re -enforced concrete Pipe 48 inch <br />66 inch <br />84 inch 90 <br />inch 78 inch <br />20.50 <br />27.00 <br />39.25 <br />40.50 38.00 <br />Manholes 7.00 P,"anhole curbs ^nd covers <br />I7.00 <br />Cast iron pipe. I2 inch 8 inch <br />Out let <br />structure <br />Junction chamber <br />5.00 3.50 <br />5,000.00 <br />I.9800.00 <br />Receiving chamber I,000.00. <br />Bid of Columbia Construction Co. <br />Re -enforced Concrete Pipe 90 inch <br />84 inch <br />78 inch <br />66 inch 48 inch <br />37.00 <br />36.00 <br />35.00 <br />20.00 15.00 <br />Manholes 8.00 <br />Cast Iron Pipe I2 inch 8 inch <br />3.00 I.50 <br />Outlet Structure Junction Chamber <br />Receiving chamber <br />7.9500.00 I.0200.00 <br />2,000.00 <br />Bids v.Tere received, opened a -,'!-read on the <br />Improvement of "agnolia <br />street under <br />Improvement Resolution No.I6I7 as follows: <br />H. Reed Pnd Sons, <br />Concrete Pavement Intersections <br />'''ater conn.L.S. <br />"'ater Conn S. S. <br />4.64 7.09 <br />35.00 <br />26.00 <br />Sewer Connections <br />I.40 <br />Reith Riley Construction Co. <br />Sheet Asphalt Asphaltic Concrete <br />ater Conn L. S. <br />T"'ater Conn. S. S. <br />4.99 4.72 <br />30.00 <br />22.00 <br />Street Intersections <br />9.78 9.35 <br />".'illiston Construction Co. <br />Sheet Asphalt Asphaltic Concrete <br />','later Conn.. L. S. <br />`'Water Conn S. S. <br />5.04 4.89 <br />30.00 <br />22.00 <br />Street Intersections <br />9.76 9.40. <br />
The URL can be used to link to this page
Your browser does not support the video tag.