My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/21/1926 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1926
>
04/21/1926 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:35:19 AM
Creation date
3/8/2018 1:00:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/21/1926
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
91 <br />Wednesday, April 21, 1926 (continued) <br />i <br />I <br />City Engineer filed plans and specifications and Board adopted and <br />confirmed the following Improvement Resolutions: <br />i Improvement Resolution 1111651 for Grade, Curb and Vtalk and Pavement on <br />j ha Salle Avenue from Sunnyside Avenue to Llreenlawn Avenu <br />Improvement Resolution 71165.0. for grade, curb and walk and pavement on <br />Harriet;Street from Jefferson Blvd. to.1:clinley Avenue. <br />j . <br />Improvement Resolution ;1652 for grade, curb and malk, sewer and pavement <br />in Coquillard `Floods First Addition. <br />In the above matters the Coquillard hand Company, sole owners,of the pro- <br />perty affected, waived all objections to the manner in which said proceedings <br />were conducted. <br />Ij <br />Board received, opened and considered bids for the following Improvements: <br />Improvement Resolution ,r1652. <br />0 <br />• <br />0 <br />Sheet Asphalt Pavement <br />`�'Jater connections, long side <br />.r`ater connections, short side <br />15 inch sewer pipe <br />tT Tt tt <br />12 <br />8 tT sT Tt <br />6 It Tt tt <br />42 inch re-inforced concrete pipe <br />36 TT Tt rt it <br />30 Tt 11 TT tT <br />Manholes <br />Manholes, curbs and covers <br />Albert Constn. Co. <br />7.85 lin. ft. <br />-3500 each <br />25.00 each <br />3.00 <br />li.f <br />t. <br />2.30 <br />lin. <br />ft. <br />.50 <br />Tt <br />t1 <br />1.00 <br />n <br />tr <br />13.00 <br />" <br />tt <br />12.00 <br />Tt <br />tT <br />10.50 <br />TT <br />Tt <br />8.00 <br />each <br />16.00 <br />each <br />Williston Constn. Co.jl <br />7.68 1n : 'ice' 1 <br />30.00 each <br />22.50 each <br />2.80 <br />lin. <br />ft. <br />2.20 <br />IT <br />t1 <br />.80 <br />It <br />n <br />1.00 <br />n <br />Tt <br />12.00 <br />tT <br />It <br />11.50 <br />T1 <br />tT <br />9.50 <br />tT <br />tt <br />8.5 <br />each <br />16.00 <br />each <br />The Jilliston Construction Company, being the lowest bidder, was awarded - <br />the contract at his low bid of �253,390.82. <br />Improvement Resolution 7r1650:' . <br />Sheet Asphalt Pavement <br />Concrete Pavement <br />rater connections, long side <br />'dater connections , short side <br />Intersections <br />Sheet Asphalt <br />Concrete <br />Albert Con6tia Co. <br />4673 lin. ft. <br />4.68 n It <br />28.00 each <br />20.00 " <br />9.46 lin. ft. <br />9.37 Tt It <br />I'Jilliston Constn. Co <br />4.80 lin. ft. <br />4.76 TT IT . <br />29.00 each <br />22.00 11 <br />9.64 lin. ft. <br />9156 " It , <br />The albert Construction Company, being the lowest bidder, was awarded <br />the contract at their low bid of �19,756.45, for sheet asphalt <br />Improvement Resolution r"1651. <br />Sheet Asphalt Pavement <br />Concrete Pavement <br />Water connections, long side <br />'01ater connections, short side <br />Intersections <br />Sheet Asphalt <br />Concrete <br />Albert Constn. Co. <br />4.97 lin.ft. <br />4.92 tin. ft. <br />28.00 each <br />20.00 It <br />10.05 lin.ft. <br />9.96 " <br />Jilliston Constn. Co.l <br />505 lin.ft. I <br />5.01 11 tt <br />29.00 each <br />22.00 In <br />10.25 lin.ft. <br />10.17 It it <br />The Albert Construction Conpany, being the lowest bidder, was awarded <br />the -contract at their low bid of �28,264.25, for sheet asphalt. <br />Engineer filed tabulations of bads as follows: <br />Sewer on Longfellow Avenue, under Improvement Resolution Y"1.639. <br />John F. Hipskind 9,143.00 <br />C. E. Reesh 9.995.30 <br />Geo. lontarelli .9,529.00 <br />Geo. A. Harrop 109059.50 <br />Spad.oni & Arnberg 10,058.40 <br />Upon the recommendation of Mr. Wray, <br />Join F. Hipki.nd at his low bid of �9,143.00.. <br />the contract was awarded to <br />
The URL can be used to link to this page
Your browser does not support the video tag.