My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lochmueller Group Inc. - Lincolnway East Corridor Improvements
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - Lochmueller Group Inc. - Lincolnway East Corridor Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:45:05 AM
Creation date
2/14/2018 3:06:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Engineer may, after giving seven days written notice to Owner, suspend services under <br />this Agreement until Owner has paid in full all non -disputed amounts due for services, <br />expenses, and other related charges. Owner waives any and all claims against Engineer <br />for any such suspension. <br />C. Disputed Invoices: If Owner contests an invoice, Owner shall promptly advise Engineer of <br />the specific basis for doing so, may withhold only that portion so contested, and must pay the <br />undisputed portion. <br />D. Legislative Actions: If after the Effective Date any governmental entity takes a legislative <br />action that imposes taxes, fees, or charges on Engineer's services or compensation under this <br />Agreement, then the Engineer may invoice such new taxes, fees, or charges as a Reimbursable <br />Expense to which a factor of 1.0 shall be applied. Owner shall reimburse Engineer for the <br />cost of such invoiced new taxes, fees, and charges; such reimbursement shall be in addition <br />to the compensation to which Engineer is entitled under the terms of Exhibit C 1 and C2. <br />ARTICLE 5 — OPINIONS OF COST <br />5.01 Opinions of Probable Construction Cost <br />A. Engineer's opinions of probable Construction Cost are to be made on the basis of Engineer's <br />experience and qualifications and represent Engineer's best judgment as an experienced and <br />qualified professional generally familiar with the construction industry. However, because <br />Engineer has no control over the cost of labor, materials, equipment, or services furnished by <br />others, or over contractors' methods of determining prices, or over competitive bidding or <br />market conditions, Engineer cannot and does not guarantee that proposals, bids, or actual <br />Construction Cost will not vary from opinions of probable Construction Cost prepared by <br />Engineer. If Owner requires greater assurance as to probable Construction Cost, Owner must <br />employ an independent cost estimator as provided in Exhibit B. <br />5.02 Designing to Construction Cost Limit <br />A. If a Construction Cost limit is established between Owner and Engineer, such Construction <br />Cost limit and a statement of Engineer's rights and responsibilities with respect thereto will <br />be specifically set forth in Exhibit F, "Construction Cost Limit," to this Agreement. <br />5.03 Opinions of Total Project Costs <br />A. The services, if any, of Engineer with respect to Total Project Costs shall be limited to <br />assisting the Owner in collating the various cost categories which comprise Total Project <br />Costs. Engineer assumes no responsibility for the accuracy of any opinions of Total Project <br />Costs, <br />ARTICLE 6 — GENERAL CONSIDERATIONS <br />6.01 Standards of Performance <br />A. Standard of Care: The standard of care for all professional engineering and related services <br />performed or furnished by Engineer under this Agreement will be the care and skill ordinarily <br />used by members of the subject profession practicing under similar circumstances at the same <br />Page 3 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.