Laserfiche WebLink
1. Engineer neither guarantees the performance of any Contractor nor assumes responsibility for any <br />Contractor's failure to furnish and perform the Work in accordance with the Contract Documents. <br />J. Engineer shall not provide or have any responsibility for surety bonding or insurance -related advice, <br />recommendations, counseling, or research, or enforcement of construction insurance or surety <br />bonding requirements. <br />K. Engineer shall not be responsible for the acts or omissions of any Contractor, Subcontractor, or <br />Supplier, or of any of their agents or employees or of any other persons (except Engineer's own <br />agents, employees, and Consultants) at the Site or otherwise furnishing or performing any Work; <br />or for any decision made regarding the Contract Documents, or any application, interpretation, or <br />clarification, of the Contract Documents, other than those made by Engineer. <br />L. While at the Site, Engineer's employees and representatives shall comply with the specific <br />applicable requirements of Contractor's and Owner's safety programs of which Engineer has been <br />informed in writing. <br />6.02 Design YVithoirt Construction Phase Services <br />A. Engineer shall be responsible only for those Construction Phase services expressly required of <br />Engineer in Exhibit A, Paragraph A1.05. With the exception of such expressly required <br />services, Engineer shall have no design, Shop Drawing review, or other obligations during <br />construction and Owner assumes all responsibility for the application and interpretation of the <br />Contract Documents, review and response to Contractor claims, contract administration, processing <br />Change Orders, revisions to the Contract Documents during construction, construction surety <br />bonding and insurance requirements, construction observation and review, review of payment <br />applications, and all other necessary Construction Phase engineering and professional services. <br />Owner waives all claims against the Engineer that may be connected in any way to Construction <br />Phase engineering or professional services except for those services that are expressly required of <br />Engineer in Exhibit A, Paragraph Al.05. <br />6.03 Use of Documents <br />A. The Owner acknowledges the Engineer's construction documents, including all electronic <br />files, as instruments of professional services. Nevertheless, the final construction documents, <br />including all electronic files, prepared under this agreement shall become the property of the <br />Owner upon completion of services and payment in full of all monies due to the Engineer. The <br />Owner shall not reuse or make any modification to the construction documents without the <br />prior written authorization of the Engineer. All D epA are instraments of se. ..;,.v ; -Feel <br />to this Projeet, and Engineer- shal-I Vetain -AR ownership and propetly intei:est therein (ineluding <br />ht and the 6104 at the diseretion of the Engineer) whether- or not the Prej <br />meted. Owner shall not rely in any way on any Document unless it is in printed form, signed <br />or sealed by the Engineer or one of its Consultants. <br />B. Either party to this Agreement may rely that data or information set forth on paper (also known as <br />hard copies) that the party receives from the other party by mail, hand delivery, or facsimile, are the <br />items that the other party intended to send. Files in electronic media format of text, data, graphics, <br />or other types that are furnished by one party to the other are furnished only for convenience, not <br />reliance by the receiving party. Any conclusion or information obtained or derived from such <br />Page 5 <br />EJCDC E-500 Agreement Behveen Owner and Ungineer for Professional services <br />Copyright c0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />