Laserfiche WebLink
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S QUOTEFOR PUBLIC WORK <br />PROJECT NAME: FUR Traffic Camera Replacements <br />PROJECT NO. 118-006 <br />QUOTES DUE January 23, 2018 at 9:30 am <br />(Must be completed for all quotes. Please type or print) <br />Date: 1 /7 3 IS Firm: h _c <br />Address: qlf, fm— 1 <br />City/State/Zip: M1 Telephone Number: (574) 277-7eo1 _ <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />I <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, De artment of Public Works <br />and dated *3 h 8 ] for the sum of (enter the Total Quote as shown on the Proposal) <br />014g Flu s o 1p($I1O,I10. to } <br />(Enter Sum of Total Quote on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBt_ICINO I <br />Gary A GII , Presi ent <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />ACCEPTANCE <br />13 day of / 1�t.c a U 20 le <br />Version 10/31/2017 Page - 7 Public Works Quote <br />