My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to Professional Services Agreement - Abonmarche Consultants Inc - Additional Work for River Walkway
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Amendment No 1 to Professional Services Agreement - Abonmarche Consultants Inc - Additional Work for River Walkway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 8:20:16 AM
Creation date
2/14/2018 1:27:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 2 pages, referred <br />to in and part of the Agreement between <br />Owner and Engineer for Professional Services <br />dated July 11, 2017. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />The Effective Date of this Amendment is: January 23, 2018. <br />Background Data <br />Effective Date of Owner -Engineer Agreement: July 11, 2017 <br />Owner: Board of Public Works, City of South Bend, Indiana <br />Engineer: Abonmarche Consultants, Inc. <br />Project: St, Louis Boulevard Festival Street <br />Nature of Amendment: [Check those that are applicable and delete those that are inapplicable.] <br />-Z Additional Services to be performed by Engineer <br />Modifications to services of Engineer <br />Modifications to responsibilities of Owner <br />Modifications of payment to Engineer <br />Modifications to time(s) for rendering services <br />Modifications to other terms and conditions of the Agreement <br />Description of Modifications: <br />Add geotechnical investigation, topographic survey and design for approximately 1,450' <br />of multi -use trail from boathouse to Sample Street. Project will include connection to <br />WPA steps, widening existing path in some areas, retaining walls, railing, INDOT <br />coordination, permitting, tree clearing on river bank and possibly new or modified guard <br />rail. Survey will extend from Northside Boulevard centerline to edge of water in the <br />river. <br />Agreement Summary: <br />Original agreement amount: $_ 125,700.00 <br />Net change for prior amendments: $ 0 <br />This amendment amount: $ 46,900.00 <br />Adjusted Agreement amount: $_ 172,600.00 <br />Change in time for services (days or date, as applicable): 45 days <br />Exhibit K --Amendment to owner -Engineer Agreement. <br />EJCDC11 E-500, Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2014 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.