My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposal Agreement - Culligan of Mishawaka - MPAC Water Softening System
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Proposal Agreement - Culligan of Mishawaka - MPAC Water Softening System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:57:03 AM
Creation date
1/24/2018 10:19:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Excusive Cost -Saving! Technology ej1q <br />® "1V <br />helfor water, Baum v and dmplw <br />Culligan Tacbriology <br />Comments <br />Benefits <br />The CTIVI comes complete With <br />More reliable and accurate <br />than Installing generic flow <br />Integrated FI'OW Meters & <br />Culligan-desIgned meterand <br />Meters. <br />Vacuum Breakers <br />vaCLIurn breakers Integrated into the <br />control, <br />Avoids accidental vacuum <br />collapse In FPR tanks, <br />Brine Reclaim <br />Relums reusable brine to the lank <br />Reduces salt usage by up to <br />clUring the regeneration phase <br />26% <br />Mitigates changes In water quality <br />Improved Efficiency of <br />Aqua Sensor/Smart Brine <br />by signaling regeneration based on <br />Systems <br />Sensor Accessories <br />resin bed conditions instead of on <br />Cost Savings on Water and <br />time or flow volume alone <br />salt <br />Yields higher system flow rates by <br />dynamically bringing multiple tanks <br />Saves on Initial capital <br />Progressive Flow <br />on and off line. Ideal for <br />applications where demand Is <br />Investment and operating <br />Inconsistent or periodic and for <br />expenses <br />areas with space test(ictlons <br />Remote Monitoring of Multiple <br />Easier Preventative <br />GBE Telemetry Capabilities <br />Locations or Systems with LAN -tine <br />Maintenance <br />11 <br />and Mobile Connections <br />13 <br />,,lilli 17 111111111 111'� 11111111111111 1 � <br />III, M' 7 <br />�;Ufifgan offlkid—enVy lacks the GTiTTls <br />with Full Unit Coverage for 3 years <br />- Triple the Fli-Flo 3e warranty <br />- Covers Culligan accessories <br />Covers electronic controller <br />Valve Body for 5 years <br />yrs on Hi -,Flo 33 brass, body <br />Media Tank, Brine Tank AND B,rine <br />Tanks Internals for, 5 years <br />W <br />GuNuan Consumer <br />CJVrAV <br />WOW walar, pure and simple.4 <br />culagan cons"Mer <br />
The URL can be used to link to this page
Your browser does not support the video tag.