Laserfiche WebLink
H.G. CHRISTMAN <br />GENERAL CONTRACTING <br />CARPENTRY 9 CONSULTING <br />BUILDING RESTORATION <br />January 23, 2018 <br />Alliance Architects <br />929 Lincoinway East Suite 200 <br />South Bond, IN 46601 <br />Attn: Bill Lamie <br />Re: Morris Center Bistro Renovation Bid Clarifications <br />Please accept the, following clarifications as an amendment to the City of South IBenid's bid form: <br />1. Regarding Special Provision XXI.E, we will guarantee our workmanship for one (1) year. <br />2. Regarding Sheet D1, General Note #8, we include surface patching of plaster only. Our <br />base bid is void if the plaster is not structurally sound, a condition that is unknown at this <br />time. <br />3. Alternate #1 includes carpet removal only. Floor patchiing and preparations are not <br />included. <br />4. Alternate #2 includes painting work only. Plaster patching and repairs are not included. <br />Should you have any questions or concerns, do not hesitate to, contact me at any time. <br />Sincerely: <br />H. G. Christman Construction Company, LLC <br />N'orrie Emmons <br />President <br />23186 WEST IRELAND ROAD * SOUTH BEND, IN 46614 e (574) 232-960O <br />