My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - FLIR Traffic Camera Replacements Proj No 118-006 - Martell Electric LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Quotations - FLIR Traffic Camera Replacements Proj No 118-006 - Martell Electric LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 9:08:56 AM
Creation date
1/24/2018 9:46:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: FUR Traffic Cameira Replacements <br />PROJECT NO. 118-006 <br />Y1114Y0" Bill Mll1P7r1Tr1FW*W4H-1]n1% =4 <br />(Must be completed for all quotes. Please type or print) <br />Date: January 23, 2018 Firm: Martell Electric, LLG <br />Address: 4601 Cleveland Rd <br />City/State/Zip: South Bend, IN 46628 Telephone Number: ( 574)271-5000 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />FUR Traffic Camera Replacements Project No. 118-006 <br />the City of South Bend, Indiana, in accordance with pdans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated I for the sum of (enter the Total Quote as shown on the Proposal) <br />One hundred twelve thousand four hundred eleven dollars ($ 112,411.00 <br />(Enter Sum of Total Quote on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice, Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br />By <br />V - (Signature) <br />JenQfer M. Brown President <br />(Printed Name of Person Signing) <br />ACCEPTANCE <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. MaradR, Member <br />James A. Mueller, Member <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />me] <br />Version 10/31/20117 Page - 7 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.