My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Utility Billing System - Tyler Technologies, Inc - Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Utility Billing System - Tyler Technologies, Inc - Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:56:18 AM
Creation date
1/24/2018 9:23:50 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 4, PROPOSED SOLUTION <br />Vendor must provide a narrative which addresses how the proposed software will meet the system <br />requirements and how the vendor wild approach the implementation of the SolUtloin. This Section <br />shall: <br />(1) For all proposed software components, Vendor shall clearly indicate the proposed version number <br />and software name, the current version number and software name, the planned release date for the <br />next version; <br />Tyler is proposing Munis Software. <br />Mullis Release Eady Generat Next Release Last product i Cus ers torn' i <br />Release <br />20t9,3 V12 <br />Type Adoption Avitflability Planning W-2 11,099 <br />(EA) (GA) (NRP) Year End <br />Gabxblb'act NA NA Sep 2020 2020 <br />Retired <br />(PR) <br />Apr 2021 <br />Live as of <br />Dec 1, 2017 <br />Not Available <br />20119.1 V12 <br />Feature <br />Feb 2019 <br />Apr 2019 <br />Apr 2021 <br />2021 <br />Apr 2022 <br />Not Available <br />2018.3 V12 <br />Contract <br />NA <br />NA <br />Sep 2019 <br />2019 <br />Apr 2020 <br />Not Available <br />2018.1 V12 <br />Feature <br />Feb 2018 <br />Apr 2018 <br />Apr 2020 <br />2020 <br />Apr'2021 <br />Not Available <br />2017.3 V12 <br />2017.1 V12 <br />Contract <br />Technology <br />NA <br />Feb 2017 <br />lAA <br />Sep 2017 <br />Sep 2018 <br />Apr 2019 <br />2018 <br />2019 <br />Apr 2019 <br />A1pl"2020 <br />3 <br />t 1 <br />11.3 <br />Final <br />NA <br />Jul) 2017 <br />Apr 2019 <br />2020 <br />Apr 2021 <br />195 <br />11.2.5 <br />Contract <br />NA <br />NA <br />Sep 2017 <br />2017 <br />Api, 20118 <br />8 <br />M2 <br />11.1.6 <br />11.1 <br />Feature <br />Contract <br />Feature <br />Feb 2016 <br />W <br />Feb 2015 <br />Apr 2016 <br />May 2015 <br />Apr 2018 <br />Sep 2016 <br />Apr 2017 <br />2018 <br />2016 <br />2017 <br />A,pr 2019 <br />Api"2017 <br />Apr 201A <br />690 <br />4 <br />186 <br />10.6 <br />Final <br />N_, , , <br />Sep 2017 <br />2 018 <br />Apr 21019 <br />455 <br />I <br />(2) For the proposed software solution indicate the number of current installations and installations <br />performed in the past 5 years, by type of utility (water, wastewater, electric, gas, etc.); <br />Please reference the Client List on the electronic copy due to page limitations. <br />14 <br />City of South Bend, IIV <br />Wility ffiffloq <br />
The URL can be used to link to this page
Your browser does not support the video tag.