My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Utility Billing System - North Star Utilities Solutions - Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Utility Billing System - North Star Utilities Solutions - Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:50:43 AM
Creation date
1/24/2018 9:18:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NORTHSTAR'" <br />Once the CIS software has been installed on the organization's servers, end -user workstation configurations <br />are reviewed to ensure they are in alignment with the CIS hardware and software recommendations, such <br />as the appropriate web browser version. From this point until the end of the project and the subsequent <br />transition of support responsibilities to the CIS Client Management and Support Desk, NorthStar Utilities <br />Solutions Consultants and Implementation Specialist remain the primary contacts for support issues. <br />Once the Servers are installed, NorthStar Utilities Solutions' Technical Resources configure and customizes <br />the CIS based on the approved deliverables of Phase 2. On -going validation at the unit level is performed on <br />the work that's being performed for quality assurance purpose. <br />In preparation for validation testing, validation scenarios which mirror the organization's day-to-day <br />operations are developed. These organization -specific scenarios and their responses are the foundation for <br />the Base System Review, in which NorthStar Utilities Solutions Consultants will facilitate a step-by-step walk- <br />through of the configured system in the Testing phase. <br />The Development Phase concludes with the delivery of a configured system where the entire project team <br />participates in a walk-through of the configuration. <br />Phase Four: Test <br />The purpose of the Test Phase is to verify that the NorthStar Utilities Solutions configuration and extensions <br />defined in the Design Phase supports the organization's business processes. The first step within the Test <br />Phase is an initial data load. The data load can be manual, automated, or a combination of methods. <br />The First component of the Test phase is for representatives from all functional areas within the organization <br />actively participate in the process by entering transactional data, in a hands-on manner, which simulates the <br />organization's day-to-day operations. The objective of the Base System Review is to ensure that the CIS <br />configuration meets the organization's process requirements. Necessary process and setup adjustments are <br />made in order to fine-tune the configuration. The steps within this process traditionally include: <br />• Process review <br />• Test scenario execution <br />• Process and configuration fine-tuning <br />The second component is the Technical Audit and Performance Tuning, where an NorthStar Utilities <br />Solutions Implementation Specialist reviews the technical setup of the servers and application to ensure <br />they are production -ready. <br />The Test Phase also includes End -user Materials Development in preparation for end -user training. <br />NorthStar Utilities Solutions can provide services to prepare a Train -the -Trainer product as a starting point <br />to assist organizations in building a set of training and on-the-job tools. The Train -the -Trainer package is a <br />complete set of easily customizable training materials as per the customer's needs. From Quick Reference <br />Guides to Agendas, Outlines, Exercises, and Tip Sheets, these materials can provide the organization with <br />the benefit 'just-in-time'job aids to enhance the adoption of the CIS solution. <br />Before the solution can be deployed to the user community, the next events that take place are an import <br />of legacy data and a final Go -Live Review of the system. In this review, project team members conduct <br />another end -to -end walk-through of the configured system, including the configuration, customizations, <br />interfaces, or data imports to be used upon Go -Live. <br />NorthStar Proposal Response —South Bend Indiana <br />
The URL can be used to link to this page
Your browser does not support the video tag.