My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Utility Billing System - Infor - Part 2
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Utility Billing System - Infor - Part 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:49:49 AM
Creation date
1/24/2018 9:17:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WE= <br />• Project managing acceptance issues for commercial advantage <br />• Managing overall acceptance program and production of milestone and project plans <br />• Coordinating key technical and commercial issues with Projects, Engineering and rail depots <br />• Ongoing support to test functions, including software testing <br />• Management of project Key Performance Indicators <br />Bombardier Transportation - UK <br />2002 - 2003 <br />Project Manager — Electrostar Test <br />Leading acleclicated team to test Electrostar Electric rail vehicles in Derby and depot locations. <br />• Testing of new parts, functionality, software and engineering investigations <br />• Successfully completed test program for the new Electrostar Metro units <br />• Developed programs for the introduction of new software to all Electrostar fleets <br />0 Responsible for team budget and spend <br />Bombardier - UK/ Germany <br />2000 - 2002 <br />Lead Engineer — Nottingham Tram <br />Lead Engineer reporting to the Project Director <br />• Lead all technical aspects of the Nottingham Tram project related to the light rail vehicles <br />• Co-ordination of UK based project with multiple design teams in Germany, ensuring design meets <br />the requirements of the contract and local legislation <br />• Customer interface with project and lead design reviews with UK legislative bodies <br />• Developed commercial agreements between project groups in Germany and UK <br />• Management of the vehicle and supplier test program <br />• Development and implementation of the vehicle control system software <br />• Technical liaison between Engineering and production <br />• Support the Sales Director to promote Bombardier's Light Rail, products in the UK <br />Adtranz - UK/ France <br />1997 - 2000 <br />Project Engineer — Strasbourg Tram <br />Project Engineer on Strasbourg Tram project <br />• Supporting project functions and product introduction <br />• Responsible for achieving reliability targets and introducing change where necessary <br />• Managing provision of technical documentation and testing specifications <br />• Supporting the manufacturing process, working with the production teams resolving engineering <br />issues, incorporating improvements into the design where necessary <br />• Followed the first unit into test, managing! the Derby based test program <br />Ad:tran,z - UK/ France <br />19910-1997 <br />Started career as an apprentice, later Reliability Performance Specialist, Manufacturing Specialist and <br />Test Engineer <br />12-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.