My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 17 - WWTP Secondary Improvements Proj No 114-053 - Thieneman Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order No 17 - WWTP Secondary Improvements Proj No 114-053 - Thieneman Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:44:09 PM
Creation date
1/24/2018 9:02:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTEROFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF UTILITIES <br />TO: Members of the Board of Public Works <br />Eric Horvath, Director of Public Works <br />Clara McDaniels, Board of Public Works Attorney <br />FROM: Al Greek, Director of Utilities <br />Jacob M. Klosinski, Assistant City Engineer <br />SUBJECT: Agenda Request Form -- Change Order No. 17 <br />Project No. 114-053: Wastewater Treatment Plant Secondary Treatment <br />Improvements <br />DATE: January 10, 2018 <br />The Division of Utilities is requesting the Board of Public Works approval of Change Order No. <br />17 for Project No. 114-053 Wastewater Treatment Plant Secondary Treatment Improvements. <br />Refer to attached documents for supporting details for the subject work. <br />Change Order No. 17 addresses the following changes: <br />COP 105 — Air Header Repairs, Pipe Repairs $ 3,906.00 <br />COP 106 -- Variable Frequency Drive Modifications to RAS Pump 4 $ 1,357.00 <br />COP 107 — 8-inch Nitrification Piping Removal at Aeration Gallery $ 1,788.00 <br />COP 108 — Extend Sidewalk at South Bend of Aeration Deck $ 2,000.00 <br />NET INCREASE FOR CHANGE ORDER NO. 16 ITEMS <br />Original Contract Sum <br />Net change by previously authorized change orders <br />The contract sum prior to this change order <br />By this change order, the project amount increases by <br />The new contract sum including this change order is <br />This Change Order represents a total change of <br />Total change for the entire project <br />Time Extensions resulting from Change Order No. 17: <br />Substantial Completion: <br />Final Completion: <br />$ 9,051.00 <br />$11,885,000.00 <br />$ 2,054,218.47 <br />$13, 939,218.47 <br />$ 9,051.00 <br />$13,948,269.47 <br />+0.08% <br />+17.36% <br />0 days <br />0 days <br />The funding sources for Change Order No. 17 shall be directed from the 2018 Utilities, <br />Wastewater Capital Account (642-0630-415-43-66). If there are questions regarding the subject . <br />change order, please contact Al Greek (Ext. 4210) or Jacob M. Klosinski (Ext. 9496) at the <br />Division of Utilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.