Laserfiche WebLink
Bill of Materials <br />I. VFD Modification <br />A. RAS Pump 4 VFD <br />1. Qty. 1 — Altivar 61 VFD Control Board Kit <br />It. General Conditions and Clarifications <br />A. WME will schedule installation of the above listed components in coordination with the <br />project schedule. <br />B. Equipment startup and calibration to the extent specified. <br />C. Existing equipment and instrumentation is assumed to be in working order. Equipment <br />found to be defective or out -of -calibration will be identified by Wunderlich-Malec. Repair or <br />recalibration is not included unless specified in this proposal. <br />D. Operation and Maintenance Manuals with "As Built" drawings as in accordance with the <br />specifications. <br />E. System warranty for the equipment supplied by Wunderlich-Malec as specified. <br />F. Our Standard Terms of Sale are attached. <br />N. Exclusions <br />A. Wunderlich-Malec Environmental specifically excludes the following items. <br />1. Sales or use taxes <br />2. Performance, payment or equipment bonds. <br />3. Unloading of equipment and any common carrier charges levied because of <br />Purchaser's inability to unload the shipment in a timely manner. <br />4. Installation of equipment, instrumentation, or control panels and job site labor other than <br />as specified in this proposal. <br />6. Installation materials, brackets, stands, hangers, wire, cables, fiber optic cables, <br />clamps, piping, etc., not specifically described in our bill of materials. <br />6. Pipe taps, weldolets, threadolets, joint accessories, or other piping materials required <br />for installation or maintenance of the equipment supplied with this,proposal. We <br />specifically exclude spare spool pieces that may be required for the maintenance of flow <br />meters and control valves. <br />7. Terminations of field wiring or fiber optic connections in control panels or at the field <br />device. <br />8. Testing of fiber optic cabling systems. <br />Page 2 of 3 <br />