Laserfiche WebLink
Tuesday, October llth. , 1932. <br />��CIki __0 <br />• <br />C7 <br />• <br />0 <br />0 <br />0 <br />City Engineer, H. G. ;Vray, submitted the following estimates for the repairing <br />of the center strip occupied by the Grand 'Trunk Western Railroad Company's tracks on <br />Western Avenue: <br />ENGINEERS ESTIVATE. <br />PAVEMENT OF GRAND TRUNK AREA ON IfiESTE RN A7ENUE <br />STREET TO ff ST LINE OF LAUREL STREET. <br />12" Bank Run Gravel and Oil <br />- FROM EAST LINE OF MICHIGAN <br />1452 <br />cu yds <br />gravel 0 <br />1.00 per cu yd..........a................0.... <br />1,452.00 <br />1815 <br />gals. <br />oil a <br />.04n per gala ................................. <br />81.68 <br />1452 <br />cu yds <br />gravel @ <br />.05 cu yd - spreading - ....................... <br />72.60 <br />12 <br />cu .yds <br />sand a <br />.75 per cu yd - filler- ....................... <br />9.00 <br />3 <br />days 0. <br />.25.00 per <br />day - roller - <br />- 75.00 <br />Total ................. <br />19-690.28 <br />12" Washed Gravel and Oil <br />1452 <br />cu yds <br />gravel 1 <br />1.25 <br />per cu yd ............................. <br />11815.00 <br />! 1815 <br />gals. <br />oil a <br />.042 <br />per pal ....... <br />. ..................... <br />81.68 <br />',1452 <br />cu yds <br />gravel 0 <br />.05 <br />per cu yd - <br />spreading- ................ <br />72.60 <br />12 <br />cu yds <br />sand a <br />.75 <br />per cu yd. - <br />filler - ................ <br />9.00 <br />3 <br />days <br />25.00 per <br />day - <br />roller - <br />................ <br />75.00 <br />Total ................ <br />2,053.28 <br />9`t Crushed Stone Base with <br />3" Asp. To-p <br />'1090 <br />cu yds <br />crushed <br />stone <br />rya 2.65 per <br />cu yd .................... <br />2.888.50 <br />1090 <br />cu yds <br />crushed <br />stone <br />C .`65 per <br />cu yd -spreading- ........ <br />54.50 <br />3 <br />days 00 <br />25.00 per. <br />day <br />- roller - <br />75.00 <br />13630 <br />sq. yds <br />sheet asp <br />0 1.00 per sq <br />yd ..................... <br />3, 630.00 <br />Total <br />..................... <br />61648.00 <br />800 cu yds <br />3630 sq yds <br />8" Concrete Base with 3" asp. Ton <br />concrete 0 3.48 per cu yd. <br />sheet asphalt 0 .00 per sq yd. <br />Total <br />29784.00 <br />3,630.00 <br />61414.00 <br />8" Premixed Concrete Base with 1 " Cold IV1ix Top <br />800 cu yds concre to be se Q 3.48 per cu yd 22784.00 <br />200 tons cold mix in place 0 8.00 per ton 11600.00 <br />Tota 1 43,380.00 <br />..................... <br />Mr. J. VI . L'eInerny, attorney far the Chicago, South Shore and South Bend <br />Railway Company, was present and presented the following Preliminary Resolution, which <br />was unanimously adopted by the Board: <br />PR ELITCINA RY RE S OLUTIO N <br />RESCLUTION OF 'ITIE BOARD OF PUBLIC r:ORKS OF THE CITY OF <br />SOUTH BEND, INIPIANA, FIXING TH" FCF111 OF CONTRACT WITH <br />CHICAGO, SOUTH STORE. AM SOUTH BEND RAILROAD, giving <br />SAID RAILROAD T!11 RIGHT TO LOCATE, CONS`TRUCT, MAINTASN <br />AND OPERATE ITS RAILROAD TRACK OWER AND ACROSS CERTAIN <br />STREETS, ALLEYS, ROADS AND HIGH , AYS OF TIE CITY OF <br />SO UT H a ND , INDIAN A. <br />-00000- <br />Whereas, the Board of Public Works of the City of South Bend, in St. Joseph <br />County, Indiana, desires to enter into a contract giving the right to Chicago, South <br />Shore and South Bend Railroad, its successors and assigns, to locate, construct, <br />maintain and operate its railroad track over and across certain public streets, <br />alleys , roads and highways in said City, and. said Bo prd of Public Works having <br />det-e--mined the exact form in which said contract is to be finally adopted, which form <br />is in words and figures as follows, to -wit: <br />0 <br />