Change Order - INDOT - Safe Routes to School Lincoln Primary Center Proj No 114-078
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Change Orders
>
Change Order - INDOT - Safe Routes to School Lincoln Primary Center Proj No 114-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 1:34:35 PM
Creation date
1/9/2018 1:31:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract NOR -38062 INDIANA Date:12/21/2017 <br />Change Order No:002 <br />Contract: <br />Project: <br />Change Order Nbr: <br />Department of Transportation <br />R -38062 <br />State: 1 4018080OL04 <br />002 <br />Change Order Description: Time Extension due to Spring Tree Inspection Requirements <br />Reason Code: CHANGED COND, Constructability Related <br />Page: 3 <br />CLN PCIJ PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />Total Value for Change Order 002 = $ 0.00 <br />Contract Completion Date Time Adjustment <br />Original Completion dt: 09/01/2017 Adj comp) dt 04/27/2018 Adj No. of Days 238 <br />Explanation: Contract Completion date needed to be extended in order to include a spring inspection of installed trees and replace trees if <br />neccessary. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change Is recommended. <br />General or Standard Change Order Explanation <br />The contract completion date will need to adjusted to adhere to INDOT spec 622.06 - The planting season shall be from September 1 through the <br />following May 25, with the exception that trees shall be planted from October 1 through the following April 15, provided the trees are dormant. <br />Moving the completion date to April 27 2018 will allow for a spring inspection of the trees to be planted this fall. No additional compensation will <br />be made with this change order. <br />Change Order Explanation for Specific Line Item <br />#}**#}##*####}##t#ii##ii###iiiii#**ii###*iiiiii#*iiiii*iiiiii**ii*i*i}iiitii}itiiii}}kk <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged, <br />Contractor: <br />Signed By: <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />