My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6B(1) Resolution No. 2648
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2010
>
02-05-10 Packet
>
6B(1) Resolution No. 2648
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2010 11:10:52 AM
Creation date
2/3/2010 9:21:04 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend <br />William and Lafayette Two-Way Conversion <br />December 7, 2009 <br />Page 4 of 5 <br />4. Progression analysis along each corridor <br />5. Modifications to existing signal equipment if a signal will be recommended <br />TASK 6 -REPORT <br />This task will involve draft and final versions of the corridor study report. The report will outline <br />the conclusions reached as a result of the analyses and make geometric and traffic control <br />recommendations for each intersection within the study area, including signal upgrades <br />necessary as a result of the conversion. The report will also include a conceptual corridor <br />striping plan for both William Street and Lafayette 81vd. <br />The draft report will be submitted to the City for initial review. After comments are received, the <br />report will be revised to address comments and a final draft will be prepared. <br />TASK 7 -PRELIMINARY CONSTRUCTION COST ESTIMATE <br />The first task will include a preliminary estimate of the construction costs associated with <br />converting bath Williams St. and Lafayette Blvd. for the City to utilize for budgetary purposes. <br />The preliminary cost estimate will be updated after the City has reviewed the report and has <br />agreed to the recommended improvements. <br />FEES <br />The total lump sum fee to provide the tasks outlined in the Scope of Services is as follows: <br />Task 1 -Project Management $ 8,700.00 <br />Task 2 -Topographic Survey $ 6,000.00 <br />Task 3 -Data Collection $26,760.00 <br />Task 4 -Trip Redistribution 8~ Traffic Assignment $23,360.00 <br />Task 5 -Analysis $36,120.00 <br />Task 6 -Report $23,700.00 <br />Task 7 -Preliminary Construction Cost Estimates $ 2 720.00 <br />Total Professional Services Lump Sum Fee: $127,360.00 <br />EXCLUSIONS <br />Be advised that the services and fees quoted above do not include the following activities or <br />services: <br />1. Engineering Design of Any Recommended Improvements" <br />2. Reimbursable Fees <br />*These services can be provided by Wightman Petrie and would be subject to a new and <br />separate agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.