My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - Lawson Fisher - East Race Walkway Assessment
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - Lawson Fisher - East Race Walkway Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:47:40 AM
Creation date
12/22/2017 12:01:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
contractor to comply with Laws and Regulations applicable to such contractor's furnishing and <br />performing of its work. <br />1. Engineer neither guarantees the performance of any Contractor nor assumes responsibility for any <br />Contractor's failure to firrnish and perform the Work in accordance with the Contract Documents. <br />J. Engineer shall not provide or have any responsibility for surety bonding or insurance -related advice, <br />recommendations, counseling, or research, or enforcement of construction insurance or surety <br />bonding requirements. <br />K. Engineer shall not be responsible for the acts or omissions of any Contractor, Subcontractor, or <br />Supplier, or of any of their agents or employees or of any other persons (except Engineer's own <br />agents, employees, and Consultants) at the Site or otherwise fiirnishing or performing any Work; <br />or for any decision made regarding the Contract Documents, or any application, interpretation, or <br />clarification, of the Contract Documents, other than those made by Engineer. <br />L. While at the Site, Engineer's employees and representatives shall comply with the specific <br />applicable requirements of Contractor's and Owner's safety programs of which Engineer has been <br />informed in writing. <br />6.02 Design YYithout Construction Phase Services <br />A. Engineer shall be responsible only for those Construction Phase services expressly required of <br />Engineer in Exhibit A, Paragraph A1.05. With the exception of such expressly required <br />services, Engineer shall have no design, Shop Drawing review, or other obligations during <br />construction and Owner assumes all responsibility for the application and interpretation of the <br />Contract Documents, review and response to Contractor claims, contract administration, processing <br />Change Orders, revisions to the Contract Documents during construction, construction surety <br />bonding and insurance requirements, construction observation and review, review of payment <br />applications, and all other necessary Construction Phase engineering and professional services. <br />Owner waives all claims against the Engineer that may be connected in any way to Construction <br />Phase engineering or professional services except for those services that are expressly required of <br />Engineer in Exhibit A, Paragraph A1.05. <br />6.03 Use of Docianents <br />A. The Owner acknowledges the Engineer's construction documents, including all electronic <br />files, as instruments of professional services. Nevertheless, the final construction documents, <br />including all electronic files, prepared under this agreement shall become the property of the <br />Owner upon completion of services and payment in full of all monies clue to the Engineer. The <br />Owner shall not reuse or make any modification to the construction documents without the <br />prior written authorization of the Engineer. All Documents are instruments of ,-ocra <br />to this Pi:ojeet, and Engineer- shall retain an ownership and property interest ther-eift kinefull" <br />ffig the <br />ght and the rigM of reuse at the disefetion of the Engineer) Whether- Of -.e --lee+ is <br />eo"m' Owner shall not rely in any way on any Document unless it is in printed form, signed <br />or sealed by the Engineer or one of its Consultants. <br />B. Either party to this Agreement may rely that data or information set forth on paper (also Imown as <br />hard copies) that the party receives from the other party by mail, hand delivery, or facsimile, are the <br />Page 5 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.