My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:29:09 AM
Creation date
12/22/2017 11:59:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Article 2 of the Agreement is supplmented to include the following agreement of the parties: <br />C2.04 Compensation for Resident Project Representative Basic Services — Percentage of Construction <br />Cost Method of Payment <br />A. Owner shall pay Engineer for: <br />1. Resident Project Representative Services: For services of Engineer's Resident Project <br />Representative under Paragraph A1.05 of Exhibit A of the Agreement, an amount equal to <br />percent of the Construction Cost. This amount includes compensation for <br />Resident Project Representative's services, and those of any assistants to the Resident <br />Project Representative. The percentage of Construction Cost noted herein accounts for <br />labor, overhead, profit, and Reimbursable Expenses. The total compensation under this <br />Paragraph is estimated to be $ , based upon full-time RPR services on an eight - <br />hour workday, Monday through Friday, over a day construction schedule. <br />2. As a basis for payment to Engineer, Construction Cost will be based on one or more of the <br />following determinations with precedence in the order listed for Work designed or <br />specified by Engineer. <br />a. For Work designed or specified and incorporated in the completed Project, the actual <br />final price of the Construction Contract(s), as duly adjusted by change orders. <br />b. For Work designed or specified but not constructed, the lowest bona fide Bid received <br />from a qualified bidder for such Work; or, if the Work is not Bid, the lowest bona fide <br />negotiated proposal for such Work. <br />c. For Work designed or specified but not constructed upon which no such Bid or proposal <br />is received, Engineer's most recent opinion of probable Construction Cost. <br />d. Labor furnished by Owner for the Project will be included in the Construction Cost at <br />current market rates including a reasonable allowance for overhead and profit. <br />Materials and equipment furnished by Owner will be included at current market prices. <br />e. For purposes of determining Construction Cost under this provision, no deduction is to <br />be made from Construction Contract price on account of any penalty, liquidated <br />damages, or other amounts withheld from payments to Contractor(s). <br />Page i <br />Exhibit C — Compensation Packet RPR-3: Resident Project Representative Basic Services— Percentage of Construction Cost Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.