My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Agreement, Contracts, Proposals
>
Professional Services Agreement - A&Z Engineering LLC - Topographic Survey for the Airport Annexation Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 8:29:09 AM
Creation date
12/22/2017 11:59:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT C, consisting of pages, referred <br />to in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) — Direct Labor <br />Costs Times a Factor Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. An amount equal to Engineer's Direct Labor Costs times a factor of for the <br />services of Engineer's personnel engaged on the Project, plus Reimbursable Expenses, <br />estimated to be $ and Engineer's Consultant's charges, if any, <br />estimated to be $ <br />2. Engineer's Reimbursable Expenses Schedule is attached to this Exhibit C as Appendix 1. <br />3. The total compensation for services under Paragraph C2.01 is estimated to be <br />$ based on the following distribution of compensation: <br />a. Study and Report Phase $ <br />b. Preliminary Design Phase $ <br />c. Final Design Phase $ <br />d. Bidding or Negotiating Phase $ <br />e. Construction Phase $ <br />f. Post -Construction Phase $ <br />4. Engineer may alter the distribution of compensation between individual phases of the <br />work noted herein to be consistent with services actually rendered, but shall not exceed <br />the total estimated compensation amount unless approved in writing by Owner. See <br />C2.03.C.2 below. <br />Page 3 <br />Exhibit C — Compensation Packet BC-4: Basic Services (other than RPR) -- Direct Labor Costs Times a Factor Method of Payment <br />E3CDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.