Laserfiche WebLink
SUGGESTED FORMAT <br />{for use with E-500, 2008 Edition} <br />This is EXHIBIT C, consisting of pages, referred to <br />in and part of the Agreement between Owner and Engineer <br />for Professional Services dated , <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) — Lump Sum Method <br />of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />A Lump Sum amount of $ 53,826 based on the following estimated distribution of <br />compensation: <br />a. Topographic Survey and CAD Dwg. $ 53,826 <br />l . - elim r—y Design Phase <br />e. Final Design Phase Q <br />d.Bidding and Negotiating Phase $ <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />Page 1 <br />Exhibit C —Compensation Packet BC-1: Basic Services (other titan RPR) — Lump Sum Method of Payment <br />E.ICDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright O 2008 National Society of Professional Engineers for EdCDC, All rights reserved. <br />