My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - Morris Bistro-Palais Lobby Improvements - Wilburn Construction Company LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - Morris Bistro-Palais Lobby Improvements - Wilburn Construction Company LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:38:56 PM
Creation date
12/22/2017 11:58:03 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
��h <br />QUOTEIPROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Morris Performing Arts Center <br />Morris Bistro/Palais Lobby Improvements <br />PROJECT NO. 1031-2017 <br />QUOTES DUE December 21, 2017 9:30 AM <br />Item n <br />No <br />Description <br />Quantity <br />Unit <br />Total <br />Amount <br />Furnish all labor, services, materials, insurance and equipment for the Morris <br />1 <br />Bistro Improvements as described in Special Provisions -Project Description <br />1 <br />Sump <br />2,05"6Q0 <br />and Plans 1Specifications Sheets D1; Al-A4. <br />Furnish all labor, services, materials, insurance and equipment for the Palais <br />Lump <br />2 <br />Lobby Improvements as described in Special Provisions -Project Description <br />1 <br />Sum <br />2-00 <br />and Plans 1 Specifications Sheets B1-B5. <br />TOTAL OF ITEM '1 AND ITEM 2 <br />A Yt" Jlt <br />Item <br />No. <br />. Description <br />Quantity <br />Unit <br />Total <br />Amount <br />Delete all Demolition from Scope of Work as detailed in Drawing Sheet D1 with <br />1 <br />the exception of the mechanical and electrical Work as described in Keynotes <br />1 <br />Sump <br />�1 200 <br />No. 2 12 and 13. <br />\IArr �ln <br />Item <br />Description <br />Quantity <br />Unit <br />Total <br />Amount <br />Na <br />Drawing Sheet D1-Keynote No. 4: Delete patch and repair from Scope of <br />1 <br />Lump <br />rr ,I <br />1 <br />Work; Pre surface for new carpet CPT-1 installation. <br />Sum <br />f t <br />uwW 11 <br />A 1 TI"1'l\I ATr ill <br />Item" <br />No <br />Description <br />Quantity <br />Unit <br />Total <br />Amount <br />1 <br />Substitute Partial Floor Plan 1AIAl for Partial Floor Plan 11Al on Drawing Sheet <br />1 <br />Lump <br />Al. <br />Sum <br />w 1 Trn\1 wrr_ .IIA <br />Item <br />Description <br />Quantity <br />Unit <br />Total <br />Amount <br />No. <br />mou <br />1 <br />Delete new wood platform, drapery/track and electrical from Scope of Work, <br />1 <br />Lump <br />!� <br />described on Drawing Sheets Al A2 A3 A4. <br />Sum <br />. Yrnv Arr Jlr <br />Item" <br />Description <br />Quantity <br />Unit <br />Total <br />Amount <br />No. <br />Delete new picture and panel mold from Scope of Work, Detail 31A1, on <br />1 <br />Lump <br />1 <br />Drawings Sheets Al A2. <br />Sum <br />Version 10/17/2016 Contractor's Bid for Public Works - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.