Laserfiche WebLink
QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Morris Performing Arts Center <br />PROJECT NO. <br />QUOTES DUE <br />BASE BID <br />Morris Bistro/Palais Lobby Improvements <br />1031-2017 <br />December 21. 2017 9:30 AM <br />Item <br />Description <br />Quantity <br />Unit <br />gTotal <br />mount <br />Furnish all labor, services, materials, insurance and equipment for the Morris <br />1 <br />Bistro Improvements as described in Special Provisions -Project Description <br />1 <br />Sump <br />219, 300.00 <br />and Plans / Specifications Sheets D1; Al-A4. <br />Furnish all labor, services, materials, insurance and equipment for the Palais <br />2 <br />Lobby Improvements as described in Special Provisions -Project Description <br />1 <br />Sump <br />38,100.00 <br />and Plans / Specifications Sheets 61-135. <br />TOTAL OF ITEM 1 AND ITEM 2 <br />257,400.00 <br />ALTERNATE #1 <br />Item <br />No.Amount <br />Description <br />Quantity <br />Unit <br />Total <br />Delete all Demolition from Scope of Work as detailed in Drawing Sheet D1 with <br />1 <br />the exception of the mechanical and electrical Work as described in Keynotes <br />1 <br />Sump <br />(81100.00) <br />No. 2, 12, and 13. <br />ALTERNATE #2 <br />Item <br />Description <br />Quantity <br />Unit <br />No <br />Amoual <br />nt <br />1 <br />Drawing Sheet D1-Keynote No. 4: Delete patch and repair from Scope of <br />Lump <br />Work; Prep surface for new carpet CPT-1 installation. <br />1 <br />Sum <br />(14,400.00) <br />ALTERNATE #3 <br />INo <br />Description <br />Description <br />Quantity <br />Unit <br />Amount <br />1 <br />Substitute Partial Floor Plan 1A/A1 for Partial Floor Plan 1/Al on Drawing Sheet <br />1 <br />Lump <br />Al. <br />Sum <br />44,900.00) <br />ALTERNATE #4 <br />Item <br />Description <br />Quantity <br />Unit <br />Total <br />Amount <br />1 <br />Delete new wood platform, drapery/track and electrical from Scope of Work, <br />1 <br />Lump <br />(13, 400.00 ) <br />described onDrawin Sheets Al, A2, A3, A4. <br />Sum <br />ALTERNATE #5 <br />Item <br />No <br />Description <br />Quantity <br />Unit <br />Amoual <br />nt <br />1 <br />Delete new picture and panel mold from Scope of Work, Detail 3/A1, an <br />1 <br />Lump <br />(3,000.00) <br />Drawings Sheets Al, A2. <br />Sum <br />Version 10/17/2016 Contractor's Bid for Public Works - 6 <br />