Laserfiche WebLink
1 <br />PROJECT NAME; Century Center Fire Pump Replacement <br />PROJECT NO. 117-038 <br />QUOTES DUE DeceMbGr 19, 2017 <br />(Must be completed for all quotes. Please type or print) <br />Date: DECEMBER 19, 2017 Firm: FE MORAN FIRE PROTECTION -MISHAWAKA <br />Address: 2020 WENT AVE SUITE A <br />City/State/Zip: MISHAWAKA, IN 46545 Telephone Number: ( 574 ) 318-4109 � <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />CENTURY CENTER- FIRE PUMP REPLACEMENT- 120 DR MARTIN LUTHER KING JR DR. SOUTH BEND IN. 46601 <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated DECEMBER 19, 2017 for the sum of (enter the Total Quote as shown on the Proposal) <br />FIFTY -FIVE THOUSAND FIVE HUNDRED NINTY FIVE AND 001100 ($ 55,595.00 ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each In accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are <br />shown in the original contract if accepted by the City of Soi <br />the Itemization of the units shall be shown on a separate,et <br />needed, the cost of units must be the same as that <br />th®Bend. if the quote,is to be awarded on a unit basis, <br />ACCEPTANCE <br />The above quote is accepted this 19TFI day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />DECEMBER 20 17 <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />Version 10118/2016 Page - 7 Public Works Quote <br />