My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 16 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc (2)
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Change Orders
>
Change Order No 16 - WWTP Secondary Treatment Improvements Proj No 114-053 - Thieneman Construction Inc (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2025 2:34:23 PM
Creation date
12/22/2017 11:41:24 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I . <br />CO QUOTATION <br />DATE: 7120/17 --•_ �1.�• .. <br />1l�� �trt1i1� <br />PRICE IS VALID �r <br />1415 FAIRVIEW STREET • ANDERSON, IN 46016 FOR 30 DAYS <br />PHONE: (765) 649-5577 - FAX; (766) 641-1567 <br />E-MAIL; ESTIMAT(NG@MOFABINC.COM ADD/-NDUMS REVIEWED: NIA <br />CUSTOMER; Thieneman Construction ESTIMATED BY: Max W. Hains 11 <br />South Bend Secondary Trtrnnt <br />ADDRESS; 521 W. 84th Drive Suite A PROJECT NAME. Additional Covered Plates with Hales <br />P CITY, STATE, ZIP: Merrillville, IN 46410 PROJECT LOCATION: South Bend, IN <br />E <br />ATTENTION: Jason DavidsonY �.� QUOTE NUMBER; 72017 <br />?STIMATED DELIVERY TIME: T.B.D. F.O.B.: OUR TRUCK JOgSITE TERMS: NET 30 <br />— <br />QUANTITY DESCRIPTION UNIT PRICE EXTENDED PRICE <br />ONE LOT IWORK <br />MISC. METAL FABRICATIONS PER OUR ATTACHED SCOPE OF <br />AND LIST OF EXCLUSIONS, <br />FURNISHED AND DELIVERED ONLY, FOR THE SUM OF: <br />THANK YOU FOR THE OPPORTUNITY TO QUOTE. IF YOU <br />HAVE ANY QUESTIONS OR NEED FURTHER ASSISTANCE <br />PLEASE DO NOT HESITATE TO CALL. <br />THIS IS AN ESTIMATE ONLY, NOT A CONTRACT FOR SERVICES. THIS ESTIMATE IS FOR <br />COMPLETING THE JOB AS DESCRIBED ABOVE. IT IS BASED ON OUR EVALUATION OF THE CONTRACT <br />)OCUMENTS AND DOES NOT INCLUDE MATERIAL PRICE INCREASES AND/OR ADDITIONAL LABOR <br />kND MATERIALS WHICH MAY BE REQUIRED SHOULD UNFORSEEN PROBLEMS ARISE AFTER THE <br />NORK HAS STARTED. <br />MaxW. �taWAIS2 <br />BY: ACCEPTED: <br />Max W. Hains 11, Estimator <br />DATE; <br />$ 2, 080.00 <br />PLUS TAX <br />IF APPLICABLE <br />$ 2,080.00 <br />PAGE 1 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.