Laserfiche WebLink
Alicia Czarnecki <br />From: Sue Ellen Doudrick <br />Sent: Tuesday, December 19, 2017 3:16 PM <br />To: Linda Martin <br />Cc: Kara Boyles; Alicia Czarnecki <br />Subject: FW: Downtown Bridge Striping <br />Hi Linda, <br />Due to the questions that arose during the review of the bids, I reached out to the only bidder on Downtown Bridge <br />Striping —Greg Lowe at The Airmarking. Their bid did not include Maintenance of Traffic and Mobilization and <br />Demobilization on their base bid. Greg confirms below that these two line items are covered in their Alternate 2 <br />(Addendum 2 bid). <br />The Alternate 2 bid is correct. However, there was no bid received for Alternate 1 as this contractor (again the only <br />contractor who bid on the project) cannot perform Thermopaint striping and markings — which are the work items <br />included in Alternate 1. <br />The Engineering Division wishes to proceed with awarding the Base Bid + Alternate 2 (Addendum 2), which yields a total <br />project cost of $72,500.20. This is in line with what we estimated. The total listed on the submittal was for: <br />Base Bid <br />+Alternate 2 (Addendum 1) <br />+Alternate 2 (Addendum 2) <br />$116k <br />Please advise as this project is planned to be awarded on 12/21. <br />Thank you, <br />Sue Ellen <br />From: Greg Lowe [mailto:greg@airmarking.com] <br />Sent: Tuesday, December 19, 2017 2:31 PM <br />To: Sue Ellen Doudrick <sdoudric@southbendin.gov> <br />Subject: Downtown Bridge Striping <br />Sue Ellen - <br />On the base bid package the thermopaint items, we do not use that type of material so we included the maintenance of <br />traffic and mob/demob on alternate 2, which is the hot thermoplastic, which is the product used by Airmarking. The <br />alternate 2 was sent out later which stated either/or on the product used. This is why the maintenance of traffic and <br />mob/demob was used on that portion of the proposal. <br />If you feel you need more information or have additional questions let me know. <br />Thank you - <br />Greg Lowe <br />President I The Airmarking Co., Inc. <br />