r V.
<br />r
<br />1
<br />B}D1PROPQSAL ' `� ram:;'•=;�,��
<br />CITY OF SOUTH BEND
<br />rovements s
<br />Project {dame .Jefferson and TwyctCenhartY Slgt�al Im p .
<br />Project No. 116-027
<br />For Bids Clue JuIW11-,4W December 19, 2017 at Sam
<br />BIDDER
<br />Description
<br />Quantity T�yL.S
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Mobilization & Demobilization
<br />1
<br />$9,000'
<br />$9,000
<br />2
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$2,000
<br />$2,000
<br />3
<br />Traffic Signal Equipment, Remove & Salvage
<br />1
<br />LS
<br />$3,100
<br />$3,100
<br />4
<br />5
<br />Signal Cantilever Structure, Drilled Shaft
<br />Foundation, Type A
<br />Signal Cantilever Structure, Single Arm 26 ft.
<br />4
<br />1
<br />EA
<br />EA
<br />$2,200
<br />$7,900
<br />$2,200
<br />$7,900
<br />6 p
<br />~Signal Cantilever Structure, Single Arm 30 ft.
<br />3
<br />EA
<br />$8,400
<br />$25,200
<br />7
<br />Trafflc Signal Head, 3-Section, LED
<br />6
<br />EA
<br />$700
<br />$4,200
<br />8
<br />Traffic Signal Head, 6-Section, LED
<br />2
<br />EA
<br />$1,100
<br />$2,200
<br />9
<br />Handhole, Signal, Type 1
<br />4
<br />EA
<br />$950
<br />$3,800
<br />10
<br />Pedestrian Push Button wl RIO-Se sign
<br />8
<br />EA
<br />$820
<br />$6,560
<br />11
<br />Pedestrian Signal Head with Countdown, 18-
<br />Inch
<br />8
<br />EA
<br />$650
<br />$5,200
<br />12
<br />Conduit, HDPE, 2-inch, Schedule 80
<br />500
<br />LF
<br />$12.50
<br />$6,250
<br />13
<br />Conduit, HDPE, 3-inch, Schedule 80
<br />50
<br />LF
<br />$40
<br />$2,000
<br />14
<br />Signal Cable, Control, Copper 7c/14GA
<br />416
<br />LF
<br />$1.90
<br />$788.50
<br />1G
<br />Sianal Cable Control, Copper 5c/14GA
<br />1674
<br />LF
<br />$1.80
<br />$2,833.20
<br />17
<br />Si nal Cable, Service, Co er 3c/8
<br />25
<br />LF
<br />$3.00
<br />$75.00
<br />18
<br />Vehicle Video Detection System
<br />4
<br />EA
<br />$9,500
<br />$38,000
<br />19
<br />20
<br />Traffic Signal Controller and Cabinet P-1
<br />Controller Cabinet Foundation P-1
<br />1
<br />1
<br />EA.
<br />EA
<br />$25,000
<br />750
<br />$25,000
<br />750
<br />21
<br />TESCD Cabinet and Foundation
<br />1
<br />EA
<br />6,802. _� W
<br />$6,800
<br />22
<br />23
<br />Sodding,70
<br />Sidewalk
<br />106
<br />SYS
<br />SYS
<br />4.50
<br />80
<br />$315.00
<br />$8,480
<br />24
<br />Special Concrete Curb
<br />160
<br />LF
<br />42.40
<br />$6,360
<br />26
<br />Pavement Patch
<br />35
<br />SYS
<br />$296
<br />$10,360,
<br />26 1
<br />_HMA
<br />Sidewalk Curb Ram
<br />36
<br />SYS
<br />$265
<br />$9,540
<br />Version 10/17/2017 Contractor's Bid for Publle Worsts - 7 Addendum #1
<br />
|