� ,vr�Q",
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Jefferson & Tw kenham Signal Improvements
<br />Project No. 116-027
<br />For Bids Due: December 19 2017 at 9 am
<br />BIDDER MICHIANA CONTRACTING INC
<br />AACc Rin
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Mobilization & Demobilization
<br />1
<br />LS
<br />$ 10,000.00
<br />$ 10,000.00
<br />2
<br />Maintenance fo Traffic
<br />1
<br />LS
<br />$ 500.00
<br />$ 500.00
<br />3
<br />Traffice Signal Equipment, Remove & Salvage
<br />1
<br />LS
<br />$ 2,500.00
<br />$ 2,500.00
<br />44
<br />Signal Cantilever Structure, Drilled Sat, Foundation,
<br />TvDeA
<br />EA
<br />$ 6,500.00
<br />$ 26,000.00
<br />5
<br />Signal Cantilever Structure, Single Arm 25ft.
<br />1
<br />EA
<br />$ 9,500,00
<br />$ 9,500.00
<br />6
<br />Signal Cantilever Structure, Single Arm 30 ft.
<br />3
<br />EA
<br />$ 10,000.00
<br />$ 30,000,00
<br />7
<br />Traffic Signal Head, 3- Section LED
<br />6
<br />EA
<br />$ 900.00
<br />$ 5,400.00
<br />8
<br />Traffic Signal head, 5- Section, LED
<br />2
<br />EA
<br />$ 1,300.00
<br />$ 2,600.00
<br />9
<br />Handhole, Signal, Type 1
<br />4
<br />EA
<br />$ 1,100.00
<br />$ 4,400.00
<br />10
<br />Pedestrian Push Button w/R10-3e sign
<br />8
<br />EA
<br />$ 1,075.00
<br />$ 8,600.00
<br />11
<br />Pedestrian Signal Head with Countdown, 18-in
<br />8
<br />EA
<br />$ 800.00
<br />$ 6,400,00
<br />12
<br />Conduit,HDPE, 2-in, Schedule80
<br />500
<br />LF
<br />$ 15.00
<br />$ 7,500.00
<br />13
<br />Conduit,HDPE ,3-in, Schedule80
<br />50
<br />LF
<br />$ 11.00
<br />$ 550.00
<br />14
<br />Signal Cable, ControlmCopper 7c/14GA
<br />415
<br />LF
<br />$ 1.80
<br />$ 747.00
<br />16
<br />Signal Cable, Control,Copper 5c/14GA
<br />1574
<br />LF
<br />$ 1.70
<br />$ 2,675.80
<br />17
<br />Signal Cable, Cotrol, Copper 3c/8
<br />25
<br />LF
<br />$ 3.00
<br />$ 75.00
<br />18
<br />Vehicle Video Detection System
<br />4
<br />EA
<br />$ 12,500.00
<br />$ 50,000.00
<br />19
<br />Traffice Signal Controller and Cabinet, P-1
<br />1
<br />EA
<br />$ 25,000.00
<br />$ 25,000.00
<br />20
<br />Controller Cabinet Foundation, P-1
<br />1
<br />EA
<br />$ 875.00
<br />$ 875.00
<br />21
<br />TESCO Cabinet and Foundation
<br />1
<br />EA
<br />$ 10,000.00
<br />$ 10,000.00
<br />22
<br />Sodding
<br />70
<br />SYS
<br />$ 40.00
<br />$ 2,800.00
<br />23
<br />Sidewalk
<br />106
<br />SYS
<br />$ 75.00
<br />$ 7,950.00
<br />24
<br />Special Concrete Curb
<br />150
<br />LF
<br />$ 40.00
<br />$ 6,000.00
<br />25
<br />HMA Pavement Patch
<br />35
<br />SYS
<br />$ 280.00
<br />$ 9,800.00
<br />26
<br />Sidewalk Curb Ramp
<br />36
<br />SYS
<br />$ 250.00
<br />$ 9,000.00
<br />
|