Laserfiche WebLink
� ,vr�Q", <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Jefferson & Tw kenham Signal Improvements <br />Project No. 116-027 <br />For Bids Due: December 19 2017 at 9 am <br />BIDDER MICHIANA CONTRACTING INC <br />AACc Rin <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization & Demobilization <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />2 <br />Maintenance fo Traffic <br />1 <br />LS <br />$ 500.00 <br />$ 500.00 <br />3 <br />Traffice Signal Equipment, Remove & Salvage <br />1 <br />LS <br />$ 2,500.00 <br />$ 2,500.00 <br />44 <br />Signal Cantilever Structure, Drilled Sat, Foundation, <br />TvDeA <br />EA <br />$ 6,500.00 <br />$ 26,000.00 <br />5 <br />Signal Cantilever Structure, Single Arm 25ft. <br />1 <br />EA <br />$ 9,500,00 <br />$ 9,500.00 <br />6 <br />Signal Cantilever Structure, Single Arm 30 ft. <br />3 <br />EA <br />$ 10,000.00 <br />$ 30,000,00 <br />7 <br />Traffic Signal Head, 3- Section LED <br />6 <br />EA <br />$ 900.00 <br />$ 5,400.00 <br />8 <br />Traffic Signal head, 5- Section, LED <br />2 <br />EA <br />$ 1,300.00 <br />$ 2,600.00 <br />9 <br />Handhole, Signal, Type 1 <br />4 <br />EA <br />$ 1,100.00 <br />$ 4,400.00 <br />10 <br />Pedestrian Push Button w/R10-3e sign <br />8 <br />EA <br />$ 1,075.00 <br />$ 8,600.00 <br />11 <br />Pedestrian Signal Head with Countdown, 18-in <br />8 <br />EA <br />$ 800.00 <br />$ 6,400,00 <br />12 <br />Conduit,HDPE, 2-in, Schedule80 <br />500 <br />LF <br />$ 15.00 <br />$ 7,500.00 <br />13 <br />Conduit,HDPE ,3-in, Schedule80 <br />50 <br />LF <br />$ 11.00 <br />$ 550.00 <br />14 <br />Signal Cable, ControlmCopper 7c/14GA <br />415 <br />LF <br />$ 1.80 <br />$ 747.00 <br />16 <br />Signal Cable, Control,Copper 5c/14GA <br />1574 <br />LF <br />$ 1.70 <br />$ 2,675.80 <br />17 <br />Signal Cable, Cotrol, Copper 3c/8 <br />25 <br />LF <br />$ 3.00 <br />$ 75.00 <br />18 <br />Vehicle Video Detection System <br />4 <br />EA <br />$ 12,500.00 <br />$ 50,000.00 <br />19 <br />Traffice Signal Controller and Cabinet, P-1 <br />1 <br />EA <br />$ 25,000.00 <br />$ 25,000.00 <br />20 <br />Controller Cabinet Foundation, P-1 <br />1 <br />EA <br />$ 875.00 <br />$ 875.00 <br />21 <br />TESCO Cabinet and Foundation <br />1 <br />EA <br />$ 10,000.00 <br />$ 10,000.00 <br />22 <br />Sodding <br />70 <br />SYS <br />$ 40.00 <br />$ 2,800.00 <br />23 <br />Sidewalk <br />106 <br />SYS <br />$ 75.00 <br />$ 7,950.00 <br />24 <br />Special Concrete Curb <br />150 <br />LF <br />$ 40.00 <br />$ 6,000.00 <br />25 <br />HMA Pavement Patch <br />35 <br />SYS <br />$ 280.00 <br />$ 9,800.00 <br />26 <br />Sidewalk Curb Ramp <br />36 <br />SYS <br />$ 250.00 <br />$ 9,000.00 <br />