Laserfiche WebLink
,r(mrr; <br />131DlPROPOSALLA <br />U <br />CITY OF SOUTH BEND <br />6 <br />Project Name Jefferson and Twyckenham Signal Improvements <br />Project No. 116-027 <br />For Bids Due July 26111y,1W December 19, 2017 at 9am <br />BIDDER Martell Electric LLC <br />BASE BID <br />Description <br />Quantity <br />Unit <br />Unit Price. <br />Total Amount <br />1 <br />Mobilization & Demobilization <br />1 <br />LS <br />$4,972.00 <br />$4,972.00 <br />2 <br />Maintenance of Traffic <br />1 <br />LS <br />$1,559.00 <br />$1,559.00 <br />3 <br />Traffic Signal Equipment, Remove & Salvage <br />1 <br />LS <br />$4,960.00 <br />$4,960.00 <br />4 <br />Signal Cantilever Structure, Drilled Shaft <br />Foundation, T e A <br />4 <br />EA <br />$1,563.00 <br />$6,252.00 <br />5 <br />Signal Cantilever Structure, Single Arm 25 ft. <br />1 <br />EA <br />$7,769.00 <br />$7,769.00 <br />6 <br />Signal Cantilever Structure, Single Arm 30 ft. <br />3 <br />EA <br />$8,107.00 <br />$24,321.00 <br />7 <br />Traffic Signal Head, 3-Section, LED <br />6 <br />EA <br />$ 794.00 <br />$4,764.00 <br />8 <br />Traffic Signal Head, 5-Section, LED <br />2 <br />EA <br />$1,340.00 <br />$2,680.00 <br />9 <br />Handhole, Signal, Type 1 <br />4 <br />EA <br />792.00 <br />$3,168.00 <br />10 <br />Pedestrian Push Button wl R10-3e sign <br />8 <br />EA <br />$ 901.00 <br />$7,208.00 <br />11 <br />Pedestrian Signal Head with Countdown, 18- <br />inch <br />8 <br />EA <br />$ 809.00 <br />$6,472.00 <br />12 <br />Conduit, HDPE, 2-inch, Schedule 80 <br />500 <br />LF <br />$ 9.87 <br />4 935.00 <br />13 <br />Conduit, HDPE, 3-inch, Schedule 80 <br />50 <br />LF <br />$10.74 <br />537.00 <br />14 <br />Signal Cable, Control, Copper 7c/14GA <br />415 <br />LF <br />$ 2.18 <br />$ 904.70 <br />16 <br />Signal Cable, Control, Copper 5cl14GA <br />1574 <br />LF <br />$ 2.03 <br />$3,195.22 <br />17 <br />Signal Cable, Service, Copper 3ci8 <br />25 <br />LF <br />$ 2.55 <br />$ 63.75 <br />18 <br />Vehicle Video Detection System <br />4 <br />EA <br />$9,776.00 <br />$39,104.00 <br />19 <br />Traffic Si nai Controller and Cabinet, P-1 <br />1 <br />EA <br />$24 931 00 <br />$24,931.00 <br />20 <br />Controller Cabinet Foundation, P-1 <br />1 <br />EA <br />$ 694.00 <br />694.00 <br />21 <br />TESCO Cabinet and Foundation <br />1 <br />EA <br />$6,517.00 <br />6 517.00 <br />22 <br />Soddin <br />70 <br />SYS <br />$ 28.60 <br />2 002.00 <br />23 <br />Sidewalk <br />106 <br />SYS <br />$ 78.75 <br />$8,347.50 <br />24 <br />Special Concrete Curb <br />150 <br />LE <br />$ 42.00 <br />$6,300.00 <br />25 <br />HMA Pavement Patch <br />35 <br />SYS <br />$ 294.00 <br />$9,450.00 <br />26 <br />Sidewalk Curb Ramp <br />36 <br />SYS <br />$ 262.50 <br />$9,450.00 <br />Version 1011712017 Contractor's Bid for Public Works - 7 Addendum 1 <br />