s uxh
<br />BIDIPROPOSAL
<br />P
<br />CITY of sourH BEND
<br />F
<br />Project Name Jefferson and Twyckenham Signal Improvements
<br />Project No. 116-027
<br />For Blds Due iuIy2601r2W December 19, 2017 at gam
<br />BIDDER Hawk Enterprises, Inc.
<br />BASE BID
<br />_.1
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />Mobilization & Demobilization
<br />1
<br />LS
<br />$9,200.00
<br />$9,200.00
<br />2
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$9,100.00
<br />$9,100.00
<br />3
<br />Traffic Signal Equipment, Remove & Salvage
<br />1
<br />LS
<br />$2,870.00
<br />$2,870.00
<br />4
<br />Signal Cantilever Structure, Drilled Shaft
<br />Foundation, T A
<br />4
<br />EA
<br />$3,400.00�
<br />$13,600.00
<br />5
<br />Signal Cantilever Structure Single Arm 25 ft.
<br />g
<br />1
<br />EA
<br />$7,600.00�
<br />^$7,60 ...,_
<br />$7600.00
<br />6
<br />Signal Cantilever Structure, Single Arm 30 ft.
<br />3
<br />EA
<br />$8,000.00
<br />$24,000.00
<br />7
<br />8
<br />Traffic Signal Head, 3-Section, LED
<br />6
<br />2
<br />EA
<br />$755.00
<br />$4,530.00
<br />Traffic Signal Heats, 5-Section, LEI)
<br />EA
<br />$1,120.00
<br />$2,240.00
<br />9
<br />Handhole, Signal, Type 1
<br />4
<br />EA
<br />$1,200.00
<br />$4,800.00
<br />10
<br />Pedestrian Push Button wl R10-3e sign
<br />8
<br />8.__.
<br />EA
<br />EA
<br />$840.00
<br />$675.00
<br />$6,720.00
<br />11
<br />Pedestrian Signal Head with Countdown, 18-
<br />Inch
<br />$5,400.00
<br />12
<br />Conduit, HDPE, 2-inch, Schedule 80
<br />500
<br />LF
<br />$13.00
<br />$6,500.00
<br />13
<br />Conduit, HDPE, 3-Inch, Schedule 80
<br />50
<br />LF
<br />$15.00
<br />$750.00
<br />14
<br />Signal Cable, Control, Copper 7c/14GA
<br />415
<br />LF
<br />$2.25
<br />$933.75
<br />$3,148 00
<br />16
<br />....... ...... ..
<br />Signal Cable, Control, Copper 5c/14GA
<br />1574
<br />Lr
<br />$2.00
<br />17
<br />Si na! Cable, ServlceLCapper 3c/8
<br />_:_ _ .
<br />Vehicle Video Detection System
<br />-- —_
<br />25
<br />LF
<br />$3.00
<br />$75.00
<br />18
<br />4
<br />EA
<br />$9,100.00
<br />$36,400.00
<br />19
<br />Traftic,Signal Controller and Cabinet, P-1
<br />1
<br />EA
<br />_._..._.....__.._................ ._
<br />$23,120,00
<br />_._..... —_ _...
<br />$23,120.00
<br />20
<br />Controller Cabinet Foundation, P-1
<br />1
<br />1
<br />EA
<br />EA
<br />$870.00
<br />$6,120.00
<br />$870.00
<br />$6,120.00
<br />21
<br />TESCO Cabinet and Foundation
<br />22
<br />Soddin
<br />70
<br />SYS
<br />$21.00
<br />$1,470.00.mm��
<br />23
<br />Sidewalk
<br />106
<br />150
<br />SYS
<br />LF
<br />$75.00
<br />$55.00
<br />_ ._....._ ... .
<br />$7,950.00
<br />24
<br />Special Concrete Curb
<br />$8,250.00
<br />25
<br />26
<br />HMA Pavement Patch
<br />36
<br />SYS
<br />SYS
<br />$175.00
<br />$6,125.00
<br />Sidewalk Curb Ramp
<br />$250.00
<br />$9,000.00
<br />Version 10/17/2017 Contraotor's Bid for Public Works - 7 Addendum #1
<br />
|