Laserfiche WebLink
REGULAR MEETING <br />DECEMBER 12, 2017 384 <br />1 <br />1 <br />an <br />Hourly Labor Rate Requirements <br />Cost <br />Service Call Hourly Rate <br />$125.00 <br />Labor Rate — Standard Commercial Garage Door Hourly <br />Rate <br />$125.00 <br />Labor Rate — Concession Roll -Up Window <br />$125.00 <br />24 Hour Emergency Rate <br />$175.00 <br />Holiday Hourly Rate <br />$175.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Dorau and carried, the above bids were <br />referred to Central Services for review and recommendation. <br />OPENING OF BIDS — TWO (2) MORE OR LESS, 2018 OR NEWER, 18,000 LB. FOUR <br />WHEEL DRIVE CHASSIS WITH DUMP BEDS — SPEC AK (STREET DEPARTMENT <br />CAPITAL LEASE) <br />This was the date set for receiving and opening of sealed bids for the above referenced <br />equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and <br />the Tri-County News, which were found to be sufficient. The following bids were opened and <br />publicly read: <br />JORDAN FORD <br />609 E. Jefferson Blvd. <br />Mishawaka, IN 46545 <br />Bid was signed by: Debra Starkweather <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />Commitment for Contractors and Certification of Use of United States Steel Products or <br />Foundry Products was submitted. <br />Ten percent (10%) Bid Bond was submitted. <br />Indiana Local Business Preference Claim Form submitted. <br />.n <br />Description <br />I Year/Make/Model <br />Unit Price <br />With l l' Dump <br />12018 Ford F550 4x4 Regular <br />1 $64,460.00 each <br />Alternate # <br />Description <br />Cost <br />Total <br />1 <br />Plow Package: Front mounted western <br />$5,584.00 each <br />81/2' pro -plus or equal power angling <br />left and right. Plow to come equipped <br />with safety approved lights and <br />markers, and snow deflector <br />2 <br />Front mounted 81/2' Western PVP Plus <br />$6,085.00 each <br />or equal. Plow to come equipped with <br />safety approved lights, markers, and <br />snow deflector <br />3 <br />Dedicated CNG package with <br />$17,433.00 <br />minimum 34 GGE tanks <br />each <br />4 <br />10' flatbed mounted behind CNG tank <br />(DUMP <br />-$21,038.00 <br />cabinet on an 84" CA chassis <br />$26,972 <br />each <br />LESS 5845 <br />FLATBED) <br />Estimated number of days for delivery from award date: Chassis & Dump Body 140 to <br />154 days <br />LAKE SHORE FORD <br />244 Melton Rd. <br />Burns Harbor, IN 46304 <br />Bid was signed by: Don Hadley <br />Contractor's Non -Collusion Affidavit, Non -Debarment Affidavit, Certification Regarding <br />Investment with Iran, Employment Eligibility Verification, Non -Discrimination <br />