Laserfiche WebLink
January 22nd., 1929. <br />read and approved. <br />31:1 <br />Board met in regularsession at 9 A. 17. A-11 members present. <br />Minutes of meetings held January I5th., and. January I6th., 1929 <br />This being the date set, continued hearing was had on Im-prove- <br />vent -resolution N6.2I64 for the pavement of O'Brien Street from south line of Prast <br />Street to south line of Werwins`':i Court. <br />In the above named improvement resolution No.2164, remonstrators <br />• appeared and after hearing all property interested in said improvement and being <br />fully advised in the premises, the Board decides to rescind all former action action <br />taken on said improvement .resolution and declares same null and void and the proceed- <br />ings closed. <br />• <br />I—] <br />0 <br />• <br />• <br />The Board signed the contract with Rocco Simeri for the sewer <br />and water connections improvement on Tiarftiett Street, Lots No.588,641, 676, and 677 <br />in Sunnymede Third Addition and Lots No.794, 795, 796, and 797 in Sunnymede Fourth <br />Addition under Improvement Resolution No.2I74, in the amount of 744.40. <br />City Engineer, N. r. `dray, submitted the following report: <br />"'kith return of attached remonstrance against the improvement <br />of Tongley Avenue from ffilber Street to Johnson Street under Improvement Resolution <br />No. 2I7I, I submit the following report: <br />"There are 48 resident property owners residing on this proposed <br />improvement, I6 of whom have signed the remonstrance. This does not constitute a <br />majority and T would therefore recommend that bids be advertised for this improve- <br />; ment. <br />Very truly, <br />Ti. ,T. wrw, City Civil Engineer." <br />The Board approved the above report sustaining all former action <br />taken on said improvement resolution No.2I7I for the ravement of Longley Avenue. <br />Vo petitions ha -ring been filed for a change in the type of pave <br />ment other than that specified in the rreliminary order for the pavement of T...?iner <br />Street from east line of Yadison Park Addition to Harriett Street under Improvement <br />Resolution No.2I63, the Board this 82nd. , day of January 1929, hereby, makes a final <br />order for sheet asphalt heavy traffic navement as the type of pavement with which <br />said. street shall be improved and awards the contract for said imrrovement to <br />The Albert Construction Company at their low bid of .6,745.94. <br />No petitions having been filed for a change in the type of pave- <br />ment other 'than that specified in the preliminary order for the pavement of Catalpa <br />Avenue frpm the south line of S.14. S. B. and S. R. R. right of way to Cotter Street <br />under Imnrovement Resolution 11o.2I6I, the Board this 22nd., day of January 1929, <br />hereby makes a final order for asphaltic concrete pavement heavy traffic as the type <br />of pavement with which said street shall be improved and awards the contract for said <br />improvement to Albert Construction Company at their low bid of $6, 734. 5. <br />City Engineer, T-I. I., ':dray, filed the follo,-aing tabulations of <br />bids: <br />Tabulation of bids for the paverent of Longley Avenue from `sdilber <br />Street to Johnson Street under Improvement Resolution No.2I7I: <br />Williston Const. Co. Reith Riley Go. Albert Const. Co. C. A. Eli <br />sheet asphalt I01464.90 I0969i.88 I0,144.22 no bid <br />asp. concrete I0,891.90 I0,29I.48 9,783.82 no bid <br />concrete 9,689.45 no bid 97574.60 9*7I3.00 <br />:k�x�cx!cktc�ti�>k�k��*x{eK�k:k;k�-re;tx�c�ck�cx:?cx�cIe:Fk=k=k�k�cre�k�k�jci;xk��*>'#k�=XS;e��-��;s:w-tckti�ekk=k,k*�ti*k;�tc�c <br />Tabulation of bids for the pavement of Liston Street under Impro- <br />vement Resolution No.2I70: <br />d�illiston Co. Reith Riley Co. Albert Const. Co. S. Ti. Eldred <br />sheet asp. 3,857.40 49025.54 3,785.02 no bid <br />asp. concrete 3,733.35 3,888.56 3,66T.72 no bid <br />concrete 'A 596 50 bi 'd 3 59I 50 783 90 <br />no 3, <br />Tabulation of bids for the pavement of 1enwood Avenue from <br />Johnson Street to Olive Street under Improvement Resolution I\To.2I69: <br />Williston Co. <br />Reith Riley Co. <br />Albert Gonst. Co. <br />C. H. Eldred <br />sheet asp. I4,102.90 <br />14,I16.88 <br />I3,803.84 <br />no bid <br />asp. concrete 13,618.30 <br />I3,589.52 <br />13,322.24 <br />no bid <br />concrete I3,109.45 <br />no bid <br />139072,90 <br />13,289.52, <br />