Laserfiche WebLink
`05 <br />Tues:.ay, ugust 28th., 1928. <br />is <br />This being the date set, bias were received, opened and ,read for the <br />construction of the local sewer in Breokfiled atreet from Prairie Avenue to Indiann <br />Avenue under Improvement Resolution No.2120. Bids are as follows: <br />Ed. Di Julio J. Rothwell C.'T. Reesh No. Ind. Const. Co. <br />I8 tt <br />I.80 <br />I.70 <br />2.10 <br />1.90 <br />15" <br />1.60' <br />1.45 <br />1.50 <br />1.35 <br />12" A <br />I.30 <br />1.35 <br />1.30 <br />1.19 <br />8" <br />.50 <br />I.00 <br />.50 <br />1.00 <br />6 t* <br />.60 <br />.70 <br />.55 <br />.57 <br />1'-'anhol es <br />70.00 <br />70.00 <br />80.00 <br />58.00 <br />This being the date set, bids were received, opened and read for the <br />cons -ruction of the local sewer in Liberty Street frcm Division street to Sample Street <br />under Improvement Resolution No. 2I22. Bids are as follows <br />Edw. Di Julio C. E. Reesh R. Simeri No. Ind. Const. Co. <br />15 inch I.6G 3.40 I.50 <br />• 12 inch I.30 I.30 I.35 I.27 <br />8 inch .50 /50 /90 I.00 <br />6 inch .60 .55 �55 .50 <br />This being the date set, bids were received, opened and read for the <br />pavement improvement on Sunnyside Avenue under Improvement Resolution No.2116. "Bids <br />are as follows: <br />Albeert Const. Co. Reith Ailey Co. <br />concrete walk .20 .20 <br />concrete curb .50 .50 <br />marginal curb .40 .40 <br />comb. curb & gutter I.00 .90 <br />grading .90 .90 <br />sheet asphalt 2.67 2.65 <br />is asp. concrete 2.56 2.55 <br />storm water inlets #13 18.50 I8.50 <br />reset inlets 8e m. h. c. 3.00 3.00 <br />8 inch pipe I.00 I.00 <br />This being the date set, bids were received, opened and read for the <br />sewers, grading and ravement of various street in connection with Track Elevation <br />tinder Improvement Resolution No.` 5. Bids are as follows: <br />Silliston Co. Albert Const. Co. Aeith Riley Co. <br />walk . I8 . I7 . I8 <br />curb .50 no bid .43 <br />marginal curb .40 .40 .40 <br />comb. curb F,, GutterI.00 .90 .94 <br />grading 1.30 1.25 1.15 <br />sheet asphalt 2. 87 2.75 2.65 <br />temporary paveae_l t I.50 I.35 1.20 <br />asp. concrete no bid 2.64 2.55 <br />manholes complete 80.00 80.00 70.00 <br />curb inlets 20.00 I8150 I8.50 <br />reinforced steel .05 .04 <br />concrete in place 20.00 I8.00 I6.50 <br />lumber in place 65.00 67.50 70.00 <br />storm water inletsI2.50 no bid I2.50 <br />reset inlets 3.00 3.00 3.00 <br />reset or rebuild <br />m. h. c. I0.00 I0.00 I0.00 <br />30" pipe 9.00 8.50 8.90 <br />21" pipe 7.00 5.00 6.00 <br />1811 pipe 4.00 4.00 3.50 <br />sewer cone I.25 1.50 T.00 <br />8" pipe I.00 I.00 I.00 <br />8 <br />