Tuesday, July loth., i928.
<br />s
<br />0
<br />0
<br />0
<br />•
<br />•
<br />in route of said Sub -Trunk Sewer as suggester, .will insure a better sewer and will
<br />serve said dub -Trunk District fully as well as that ' originally planned and at an
<br />enormous saving in cost to said District.
<br />Now therefore, be it resolved that the course of said Sub -Trunk
<br />Sewer Number 3 be and the same is hereby now ordered discontinued in its course
<br />easterly from said Dundee Street and be ordered constructed &long the following line
<br />to -wit:
<br />"Beginning at a manhole in the center lineof Kenmore Street and the
<br />center line of Washing Street; thence East along the center line of Washington
<br />StreetT thirteen hundred and twenty-eight (feet (I3281). with a twenty-four inch
<br />(24") circular sewer; thence still east along the center line of Washington Street
<br />Three Hundred and Twenty-seven feet (3271) to the center line of Dundee Street *ith
<br />an eighteen inch (I811) circular sewer; thence South along the denter line of Dundee
<br />Street Five Hundred and Fifty four feet (554`f) with an eighteen inch (1811) circular
<br />sewer to the center line of Jefferson Street; thence East Six Hundred and Twenty-
<br />eight feet (6281) along the center line of Jefferson Street with an eighteen .inch
<br />( I8") circular sewer to the center line of Liberty Street."
<br />Together with the necessary manholes, store water inlets, conduits
<br />and house connections to the curb line a ong the line of said Mprotement and to
<br />be built in accordance with the specifications, detail plans, maps and estimates
<br />now on file- in the office of the Department of Public Works of said city, which
<br />include an estimate of the yroportion of the cost of an adequate local sewer built
<br />along the above line, hears to the cost of a mlin sewer to be built as follows:
<br />The cost of an adequate local sewer, built along the line above
<br />described, is hereby estimated and fixed to be eight (8%) per cent of the cost' of
<br />the main sewer to be built along said line as above set forth, which proportion, as
<br />herein estimated and fixed, shall be taken and adopted in all computations requiring
<br />a knowledge of the cost of such local sewer if built along the line where the main
<br />sewer is to be built. The cost of the construction of said sewer shall be divided
<br />as follows.
<br />(I). So much of such cost as shall be equivalent to the construction
<br />of an adequate local sewer not adapted to receive sewage from collateral drains or
<br />sewers, if built along the proposed lines as hereinbefore set forth, shall be paid
<br />for by abutting property holders and by the City of South Bend, if it be determined
<br />that the said city is benefited by the said sewer, in the same manner and to the
<br />same extent as local sewers are paid for by them, under the statute to such cases
<br />made and provided.
<br />(2). The excess cost, over and above what would be equivalent to the
<br />cost of a local sewer, if built along said line, shall be assessed against each
<br />piece of property in the district or area to be drained, and against the city, if
<br />it be determined that the said city is benefited by the said sewer, according to
<br />the manner and method prescribed by law; all of which said property beneficially
<br />affected lies within the following described territory in the city of South Bend,
<br />St. Joseph County, State of Indiana, to -wit:
<br />Beginning at the intersection of the center line of Kenmore Street jl
<br />and the north line of Washington Street; thence east along the north line of Washington;)
<br />Street to the center line of the first alley east of .Kenmore -Street; thence north along'
<br />the center line of the first alley east of Kenmore Street and said center line produced
<br />to the southerly line of the right-of-way of the New York Central Railraod; thence
<br />southeasterly along the southerly line of said right-of-way to the north and south
<br />center line of the west one half (I) of Section I0, Township 37' North, Ra e 2 East; jl
<br />thence south along the north and south center line of the west one half ( of said
<br />Section I0 to the center line of the first alley north of Division Street; thence west
<br />along the center line of the first alley north of Division Street to the center
<br />line of the first alley east of Kenmore Street; thence nort: along the center line i
<br />of the first alley east of Kenmore Street to the south line of Washington Street; j
<br />thence west along the south line of fashington Street to thecenter line of Kenmore
<br />Street; thence north along the center line of Kenmore Street to .the place of beginning. 1i
<br />And each -piece of property is said district or area above described,
<br />including abutting property holders and the city of South Bend, if it be determined
<br />that said city is benefited, shall be assessed, .as aforesaid, to pay said excess of ,
<br />cost over and above what would be equivalent to the cost of a local sewer; all of which�l
<br />will more fully appear by reference to the profile, mar, drawings .and specifications
<br />now on files in the .office of the department of Public !!forks of said city, which I�
<br />among other things, give the exact course of said proposed main sewer:; overflows,
<br />and its appurtenances, and the district or area which may be _injuriously or benefically��
<br />affected thereby, as shown by heavy boundary lines mar'ced on said map and drawings,
<br />which proper words and figures written thereon, clearly indicating what said heavy
<br />boundary lines represent, and the district or area a braced thereby.. .Assessments,
<br />if deferred, are to. be raid in ten dqual annual installments, with interest at the
<br />rate of six_ Der cent per annum. A bond or bonds shall be issued to the contractor
<br />in payment for said work, unless the property owners pay said assessments before
<br />said bond or bonds are issued. tinder no circumstances shall the city of South Bend
<br />be or be held responsible for any sum or sums due from said proprty owner.or comers
<br />for said work, or for the collection of the same, or f'or, t-he .payment - of any bond,
<br />bonds, certificate or certificates, issued to said contractor in payment for such
<br />work, except for such moneys as shall have been actually, received by said city from
<br />the assessments for such improvement..
<br />
|