My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/1928 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1928
>
04/03/1928 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 11:39:39 AM
Creation date
12/19/2017 2:11:50 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/3/1928
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3F? <br />Tuesday, April 3rd., 1998. <br />Board met in regular session at 9 A. T`. All members present. <br />jj Minutes of meetings held March 27th. , and Larch 28th. ,- 1928, read <br />I and approved. <br />City Engineer, H. G. Wray, filed plans and specifications and <br />estimates and: the Board adopted the following improvement resolutions: <br />IiImprovement Resolution No.2029 for the pavement on `'ollege "'teeet <br />from the south line of Vassar Avenue to north line of Humbolt Street. (See files for <br />resolution.) <br />j Improvement Resolution No.203I for the pavement on Brookfield <br />Street from south line of Vassar Avenue to the north line of Humbolt Street. (see <br />files for resolution.) <br />In both of the above named improvement resalutions and in improve <br />jl men.t resolution No,2028.and No. 2030 for sewers on College and Brookfield Streets <br />from Vassar to Humbolt street, respectively, property owners waived all objections <br />on and in defense to any defect in said proceedings amd to any, violation in procedure for the construction of street improvements as fixed by law. 14hereupon the Board, <br />received, ope#ed and read bids as follows: <br />Bids for the construction of local sewer on 1%ollege street betwee3 <br />Vassar Avenue and Humbolt Otreet under Improvement resolution No.2028. <br />Bid of John F. Hipskind. <br />12 inch 8 inch 6 inch L�an.holes comrlete <br />1.70 .90 .80 75.00 <br />Bids for the construction of local sewer on Bro oke fi led metre e t <br />between Vassar and Humbolt ''treet under Improvement Resolution No. 2030. <br />Rid of John F. Hipskind. <br />• <br />• <br />• _� <br />12 inch 8 in-ch 6 inc h Manholes complete <br />I.70 .90 .80 75.00 <br />This being the date set bids were received opened and read <br />for the construction of pavement on Webster 'street from Indiana Ivenue to Prairie Aven <br />ue under Improvement esolution No.I942. • <br />4illiston Oonat. Co. Albert Oonstruct. Qo. Rieth Riley Oo. <br />concrete walk .20 .20 - <br />concrete curb .60 .60 .60 <br />zparginal curb .40 .40 .40 <br />grading I.00 .90 I.00 <br />sheet asphalt 2.72 2.68 2.72 <br />asph. concrete 2.57 2.53 2.56 <br />storm water inlets 12.50 I2.50 12.50 <br />reset. inlets 3.00 3.00 3.00 <br />reset M. H. C. 3.00 3.00 3.00 <br />'hater conn. 1. s. 27.50- 25.00 20.00 • <br />1Jater cone s. s• 20.00 18.00 <br />sewer Conn 1.50 <br />8 inch pipe I.00 I.00 <br />remov.. inlets 3.00 3.00 3.00 <br />This being the date set, bids were received, opened and read <br />for the pavement of the alley between Lots I29 and I30 in "ushing and Lindsays -'�-dditio <br />ffrom- Portage 1*ven-de to alley west of Portage Avenue under Improvement esoluti on No. <br />I948. Bids as follows: <br />E. T. Tranb erg H. N. Barnes Snyder Oo. Carl Zimmer • <br />grading I.00 I.00 .90 1.30 <br />concrete pavement 2.38 2.50 2.40 2.60 <br />This being the date set, bids were received, opened and read for <br />the construction of -pavement on College Street from Elwood Avenue to Keller Street <br />under Improvement Resolution No.I983. Bids as follows: <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.