Laserfiche WebLink
NFINK <br />Study and RepeA Phase <br />D..nl:.,,.:.,,afy Design PhaseFinai Design Phase <br />cola <br />0 <br />Bidding or- Negotiating Phase <br />0 <br />Genstme4i9n tease - % <br />Paget <br />Exhibit C —Compensation Packet BC-3: Basi c Ser vi oes (other than RPR) --Percentage of Construction Cost Method of Payment <br />EJCDC E-500Agreement Between Owner and Engineer for Professional Services, <br />Copyright © 2008 Nationai Society of Professional Engineers for EJCDC. All rights reserved. <br />Study and RepeA Phase <br />D..nl:.,,.:.,,afy Design PhaseFinai Design Phase <br />cola <br />0 <br />Bidding or- Negotiating Phase <br />0 <br />Genstme4i9n tease - % <br />Paget <br />Exhibit C —Compensation Packet BC-3: Basi c Ser vi oes (other than RPR) --Percentage of Construction Cost Method of Payment <br />EJCDC E-500Agreement Between Owner and Engineer for Professional Services, <br />Copyright © 2008 Nationai Society of Professional Engineers for EJCDC. All rights reserved. <br />