Laserfiche WebLink
8. Revise the Report. and any other deliverables in response to Owner's comments, as <br />appropriate, and furnish cletronic copies of the revised Report and any other deliverables to <br />the Owner per Project Schedule (refer to Attachment A) within TBQ ealendar days of <br />receipt of Owner's comments. <br />B. Engineer's services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, <br />extent, character, or design requirements of the Project desired by Owner, and upon written <br />authorization from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the "a&ieffal•-Preliminary Design Phase tasks or deliverables: <br />as described in the Engineers scope of services <br />6. Furnish electronic review copies of the Preliminary Design Phase documents and any other <br />deliverables to Owner per Project Schedule (refer to Attachment A) .,.,fr n T-BP cale,. de <br />Elays of authefizmien to proceed with this phase, and review them with Owner. Per Project <br />Schedule (refer to attachment A) ' , Owner shall submit <br />to Engineer any comments regarding the Preliminary Design Phase documents and any <br />other deliverables. <br />7. Revise the Preliminary Design Phase documents and any other deliverables in response to <br />Owner's comments, as appropriate, and furnish to Owner electronic copies of the revised <br />Preliminary Design Phase documents, revised opinion of probable Construction Cost, and <br />any other deliverables per Project Schedule (refer to Attachment A <br />de,ys after receipt of Owner's comments. <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />Page2 <br />(Exhibit A —Engineer's Services) <br />EJCDC E-SWAgreernent Between Owner and Engineer for Professional Services <br />Copyright ©2068National Society of Professional Engineers for EJCDC. All rights reserved. <br />