My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - SBPD Forensic Lab Upgrade - Ziolkowski Construction Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - SBPD Forensic Lab Upgrade - Ziolkowski Construction Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:53:54 PM
Creation date
12/13/2017 3:32:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: South Bend Police Forensic Lab upgrade <br />i• V8. <br />Date: December 12, 2017 Firm: Ziolkowski Construction, Inc. <br />Address: 4050 Ralph Jones Drive <br />City/State/Zip: South Bend, IN 46628 Telephone Number: 574 ) 287-1811 <br />Agent of Bidder (if Applicable): n/a <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to coTVete the <br />public works project of: <br />South Bend Police Forensic Lab upgrade <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated — N/A for the sum of (enter the Total Quote as shown on the Proposal) <br />Thirty Two Thousand Three HundredNinety Eigbt ($ 32,398 <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendurns attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment, <br />The above quote is accepted this <br />Subject to the following conditions: <br />Gary A. Gilot, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />Version 10/18/2016 <br />By <br />(Signature) <br />Bill Eavxs, President <br />(Printed Name of Person Signing) <br />on <br />KE <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin, Clerk <br />Page - 1 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.