My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotations - MPAC Marquee Display Installation - US Signcrafters Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Quotations - MPAC Marquee Display Installation - US Signcrafters Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:51:15 PM
Creation date
12/13/2017 3:31:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: Morris Performing Arts Center Marquee Display Installation <br />PROJECT NO. 117-070A <br />QUOTES DUE December 12,2017 at 9:3,0 am local time <br />(Must be completed for all quotes. Please type or print) <br />Date: Firm: Us &'4'acc'—L-4e, II <br />J, <br />Address: 60.9- <br />City/State/Zip: bSce- o1a ' vQ 94 5Lo)l Telephone Number: (574 ) V74- 5. 55 <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />Mor-ris C-'mc <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of -South Bend, Department of Public Works <br />andidated for the sum of (enter the Total Quote as shown on the Proposal) <br />E\,J($ 5'2 <br />(Enter Sum ofl;7otal Quote shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addenclums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis,, the <br />itemization of the units shall be shown on a separate attachment. <br />By k6� <br />(Sign Lt, <br />P <br />r a C- <br />'Ci <br />cs <br />(Printed Name of Pars bA signing) <br />ACCEPTANCE <br />The above quote is accepted this day of <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Gary A. Gilot,, President <br />Elizabeth A. Maradik, Member <br />James A. Mueller, Member <br />Suzanna M. Fritzberg, Member <br />Therese J. Dorau, Member <br />Attest: Linda M. Martin,, Clerk <br />20 <br />Version 10/31/2017 Page - 8 Public Works Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.