My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - MPAC Water Softener System - Culligan Water
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Quotations/Proposals
>
Opening of Proposals - MPAC Water Softener System - Culligan Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 1:00:37 PM
Creation date
12/13/2017 3:23:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ADDITIONAL COMMENTS <br />Installation: <br />• Installation is included and will be performed by Culligan. Culligan will provide equipment delivery and will set <br />equipment in place. Culligan will attach inlet, outlet and drain to supplied connections. Electrical service must <br />also be available for connection to equipment. <br />• Installation service may be arranged through Culligan. Please schedule installations 7 days in advance. <br />• Installation, as quoted, is scheduled during normal business hours (8 AM to 5 PM) <br />• Please contact me/us directly for more information. <br />Start-up and Training: <br />Start-up and training is available upon request. <br />Salt Delivery: <br />• The initial salt fill shall include 900 pounds of salt delivered by Culligan to the job site. <br />• Culligan offers routine salt delivery. Our representative will deliver and load the required amount of manufacturer <br />recommended salt into the unit. Culligan will also perform a 10-point check of the unit each time salt is delivered. <br />Pricing varies with volume usage. <br />• Culligan can provide you scheduled salt delivery. Please see me for a salt quote. <br />Submittals: <br />• Provided upon your request, <br />• Product submittal documents, subject to specifying engineer approval, will be made available upon your request. <br />Please indicate the number of submittals required. <br />• Product submittal documents will be made available upon receipt of purchase order contingent upon approval by <br />the specifying engineer. Please indicate the number of submittals required. <br />Maintenance, Service and Repair <br />• Regular service hours are 8 AM to 5 PM Monday through Friday. Emergency service is available 24 hours a <br />day, seven days per week. Emergency service rates apply. <br />• Operational, maintenance and replacement requirements are essential for this product to perform properly. Your <br />system requires routine maintenance consisting of <br />Enclosures: <br />Culligan Terms and Conditions <br />
The URL can be used to link to this page
Your browser does not support the video tag.