My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec AK - Two More or Less 2018 or Newer 18,000lb Four Wheel Drive Chassis with Dump Beds - Lake Shore Ford Part 1
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Spec AK - Two More or Less 2018 or Newer 18,000lb Four Wheel Drive Chassis with Dump Beds - Lake Shore Ford Part 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 11:47:10 AM
Creation date
12/13/2017 3:20:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fleet Distribution News Bulletin F'DNB --- 1749 <br />December 8, 2017 <br />19.5 x 6.75 Aluminum Wheels <br />(D2ZAM, D4NAF) -- 2/5/2018 <br />Heated mirror w/o AC <br />(BSI4EA,B,C,D,G,K,L,M,N & AC- <br />L) 4/2/2018 <br />Transit <br />A5 <br />H2 <br />A5 — 1/29 <br />11/13, 12/25, <br />12-14 weeks <br />1115 <br />Econoline <br />B2 <br />F3 <br />A2— 1/8 <br />12/25 <br />14-16 weeks <br />MKZ <br />B4 <br />F2 <br />A2 — 1/8 <br />12/25, 1/1 <br />10-12 weeks <br />SELECT SERIES MEDIUM <br />PREMIERE SERIES MEDIUM <br />MOON ROOF CHABA BY HIGH <br />CONTINENTAL <br />A4 <br />TBD <br />A3 — 1/15 <br />12/25, 1/29, <br />10-12 weeks <br />2/19 <br />MUSTANG <br />Bl <br />TBD <br />A4 — 1/22 <br />12/25, 1/29, <br />12-14 weeks <br />64.6 D2UEF 8XIS paint alum whl <br />2/19 <br />HIGH <br />FOCUS <br />C1 <br />El <br />B1 --2/5 <br />12/25, 1/1, <br />16-18 weeks <br />1/8 <br />CMAX <br />A5 <br />E1 <br />B1 --2/5 <br />12/25, 1/1, <br />12-14 weeks <br />1/8 <br />FIESTA <br />B4 <br />it <br />B1 —2/5 <br />12/25 <br />16-18 weeks <br />SUPER DUTY <br />B2 <br />F1 <br />A3 —1/15 <br />12/25 <br />16-18 weeks <br />First available production week at the plant (not to be confused with "First Available Priority Code"). <br />"First Available Priority Code" is often beyond the first available production week at the plant due to <br />incoming orders exceeding weekly/monthly allocation. This is a point of reference determine when <br />order(s) may be submitted to the plant. <br />2 Every effort is made to accurately estimate the lead times, and reflect longer lead times of specific <br />commodities. In the absence of adjusted lead times for commodities, please use the high, medium, or low <br />risk as a guide. <br />3High-risk commodity has a lower probability of scheduling. Low -risk commodity has a higher probability <br />of scheduling. Refer also to the Product Information section in the Fleet DNB for current material hold <br />information. <br />e� eve ve�,-� '. <br />ovo� 9'C", <br />S l�j v c "D frl,_fL. <br />lk- Co & <br />Po' al� CN& <br />a �� U. n�zv�� �"p 1n e �N �'� c � C. c�,'T <br />A q0 &15 �� <br />" G\,�tSS 1 s VJL `h 5�Ic_ !d L w\. W , <br />
The URL can be used to link to this page
Your browser does not support the video tag.