My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec AG - Two More or Less 2018 or Newer 1-2 Ton Crew Cab Four Wheel Drive Pickup Trucks - Jordan Ford
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2017
>
Opening of Bids
>
Opening of Bids - Spec AG - Two More or Less 2018 or Newer 1-2 Ton Crew Cab Four Wheel Drive Pickup Trucks - Jordan Ford
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 11:44:21 AM
Creation date
12/13/2017 3:15:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fir atve <br />Tuet"Systems <br />Fresno, CA * Elkhart, IN <br />BI-FUIEL CNG/Gasoline <br />Will Gutilla 559-289-8522 <br />will@alallffuels,com Im. III <br />DATE QUOTE <br />11/30/2017 17113OWG <br />NAME ADDRESS <br />Deb Starkweather <br />Jordan Automotive Group <br />Mishawaka, IN <br />P.O. NO. <br />FORD DROP SHIP <br />TERMS <br />'REP <br />END USER <br />FOB <br />88MNZ4 <br />Due on Complefion <br />WG <br />South Bend <br />Elkhart, IN <br />ITEM <br />DESCRIPTION <br />QTY <br />PRICE EA. <br />Underbodw <br />EPA Certified Bi-Fuel CNG System <br />F150-AE10-UB-BF <br />10 GGE 2018 Ford F-1 50 5.01E <br />1 <br />$9,400,00 <br />CNG Tanks Mounted Behind Rear Axle; OEM Gasoline Tank <br />_,:;t�/ <br />Per Unit <br />Remains (Must Be Midshilp) <br />In -Bed <br />EPA Certified Bi-Fuel CNG System <br />F1 50-AE23-IIB-BF <br />23 GGE 2018 Ford F-150 5.01_ <br />1 <br />$10,900.00 <br />CNG Tank Mounted! In -Bed; OEM Gasoline Tank Remains; Cannot <br />Per Unit <br />be 5.5'Bed <br />All items in "Alternate V section of South Bend bid sent by D <br />Starkweather on 11 -21-17 are included, EXCEPT: <br />For underbody option, tanks to be installed are Type 1, not Type 4. <br />- For underbodly option, tanks will amount to 10 GGE, not the <br />required 20 GGE. <br />• No methane detector is provided, It is not recommended on this <br />vehicle type. <br />Note: Quote is contingent on 2018 EPA certification. <br />Note: Quote is good 60 days and is FOB Elkhart, IN. <br />Note: CNG tanks will have approximately 1000psi upon completion. <br />Note: After receipt of purchase order, vehicle will be put into production schedule. <br />Note: After parts and vehicle arrive please allow 25 working days for delivery of first vehicle, and approximately 5 <br />days for each additional vehicle. <br />Note: Vehicle must be ordered with Fordl's Gaseous Fuel Prep Engine option. <br />BUYER AUTHORIZATION : Buyer's signature below is acceptance to purchase the product identified above. <br />Signature............................................................ Date: ---------------------------------- <br />1Aca, <br />
The URL can be used to link to this page
Your browser does not support the video tag.