Document0 TM
<br />SURETY:
<br />CONTRACTOR:
<br />(Naive, legal .status and principal place erf business)
<br />(Narue, legal status and address)
<br />Travelers Casualty ,And Surety Company Of
<br />TRUCK CENTERS, INC.
<br />America
<br />2280 Formosa Road
<br />One Tower Square
<br />Troy, IL 62294
<br />Hartford, CT06183
<br />OWNER:
<br />Mail Notices To:
<br />(Name, legal ,status and address)
<br />Travelers
<br />City Of South Bend/Board of Public Works
<br />Attn: Surety Claim 'Dept.
<br />One Tower Square 2S1A
<br />City Count Buildin Room 13116
<br />Hartford, CT 06183
<br />2I West Jefferson treet
<br />South Bend, IN 46601
<br />BOND AMOUNT: Ten Percent of the Amount Bid .......... -...... dollars ($10% of Amount Bid)
<br />PROJECT: 2017 or Newer Tandem Axle Multi -Use Dump Truck
<br />(Name, location oraddress, (ard ProJecaitwnber•, ijany)
<br />This document has important
<br />legal consequences.
<br />Consultation with an
<br />attorney is encouraged with
<br />respect to its completion or
<br />modification.
<br />Any singular reference to
<br />Contractor, Surety, Owner,
<br />or other party shall be
<br />considered plural where
<br />applicable.
<br />The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and
<br />Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein, The
<br />conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or
<br />within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the
<br />Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract
<br />Documents, with a surety admitted in the jurisdiction of the project and otherwise acceptable to the Owner, for the faithful
<br />performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or (2) pays to the
<br />Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for
<br />which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null
<br />and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and.
<br />Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not apply to any extension
<br />exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and
<br />Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days.
<br />If this Bond is issued in connection with a subcontractor's bird to a Contractor, the term Contractor in this Frond shall be deemed
<br />to be Subcontractor and the term Owner shall be deemed to be Contractor..
<br />When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision
<br />in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such
<br />statutory or other legal requirement shall be deemed incorporated herein, When so furnished, the intent is that this. Bond shall be
<br />construed as a statutory bond and not as a common law bond.
<br />Signed and scaled this 12th day of December, 2017.
<br />(Witness) V
<br />(Witness) Donna Robson,' fi"ness
<br />TRUCK Cf E. S INC
<br />(Princi (seal)
<br />(Title) ` 6k 1
<br />Travelers CasuaftAnd Su om an V OfArnerica
<br />> (seal)
<br />(s')
<br />uw
<br />(Title) Andrew P. Thome, Attorney4r;-Fact
<br />Init.. AIA Document A310n`— 2010. Copyright @1963, 1970 and 2010 by The American Institute of Architects. All rights reserved. WARNING: This AIA Document is
<br />protected by U.S.. Copyright Lath and International Treaties. unauthorized reproduction or distribution of this AIA Document. or any portion of It, may result En
<br />severe civil and criminal penalties, and wild be prosecuted to the maximum extent possible under the law. Purchasers are permitted to reproduce ten (10) copies of this
<br />document when completed. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects' legal counsel, appyci ht@ ia.org. 01110
<br />
|