Laserfiche WebLink
SHALL BE <br />AS <br />TYPE DESCRIPTION SPECIFIED <br />(Circle One) <br />I'lusting hitch shall be provided with a set of tapered rollers in lieu of the standard <br />cams. <br />Specifications for MountinLy of Ouick Hitches <br />Mounting Truck frame will be extended forward of grill. Bidder will furnish <br />Material: minimum 2 "x 4"" x 8"" x 48 "' long angle across front bumper. <br />Bottom braces shall be installed from hitch to frame with 33/4bolts, <br />grade 8, Material I " x 4" flat iron minimum. Top braces 2"x 4ti <br />flat iron minimum and run to frame. Hose to hook up hitch and <br />cylinder shall be 3/8" and furnished by bidder. Hooked to <br />hydraulics part with 1,000 tbs. PSI port relief minimum. Bumper <br />angle is to be mounted to frame with four (4) pieces of 4" x 8" <br />minimum angle to frame. Hood to have cable stop before resting on <br />plow hitch. Plow lights to be included. <br />Truck frame will be extended forward of grill. Bidder will furnish <br />minimum 2"x 4" x 8" x 48"' long angle across front bumper, <br />Bottom braces shall be installed from hitch to frame with 3 3/4" <br />bolts, grade 8. Material V x 4" flat iron minimum. Top braces 2"x <br />4" flat iron minimum and run to frame. Hose to hook up hitch and <br />cylinder shall be 3/8" and furnished by bidder. Hooked to <br />hydraulics part with 1,000 tbs. PSI port relief minimum. Bumper <br />angle is to be mounted to frame with four (4) pieces of 4" x 8" <br />minimum angle to frame, Hood to have cable stop before resting <br />on plow hitch. Plow lights to be included. <br />Alternate #l: Front Snow Plow s BS 0 <br />Plow shall be equal to Monroe MP-4 I R-ISCT <br />Moldboard shall be constructed of 10 gauge A569 steel with a <br />tensile strength of 55,000# -70�,000#. <br />Moldboard is to be rolled formed and 100% continuously welded. <br />Overall length of plow moldboard shall be 11'. <br />NE <br />